高二英语agardenofpoems(苏教版)内容摘要:

ll me up tomorrow. • Harry was called up by the police. • stand out: • easy to be seen。 be very noticeable • work stands out from that of the others. • His red hair made him stand out in the crowd. • He tried his best to win the match for the glory of the school. • absence:being away。 lack • I soon noticed his absence from school. • That man was set free for the absence of evidence. • bring together • The teacher asked to bring all the class together and play a game. • 动名词短语做主语,谓语用单数: • Walking on the Mars is very difficult. • Seeing is believing. • 若两个动名词并列,且表示不同意思,谓语用单数。 • Reading and writing are very useful in English learning. • He was popular no matter where he was. • No matter when you leave the room,don not fet to turn off the light. • Living in the country is cheap in parison with the big cities. • May I share your umbrella? • We haven’t enough books for everyone,so。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。