高三英语ourbodyandhealthyhabits复习课件内容摘要:

while I was away. 玛丽提出在我外出期间照看婴儿。 eyed归纳拓展 keep an eye on留神;密切注意 catch sb.’s eyes 醒目;引人注意 have an eye for有判断力 make sb. open his eyes使人吃惊 see eye to eye(常与 with连用 )意见一致 shut one’s eyes to... 对 „„ 视而不见 活学活用 A crowd of local children gathered around, us in silence. 解析 eyeing us in silence作伴随状语,修饰gathered around。 B 重点短语与句型 connected with与 „„ 有联系 Can you think of any Chinese proverbs health? 你能想出和健康有关的中国谚语吗。 (回归课 本 P1) 观察思考 He is not connected with the crime. 他和这次犯罪无关。 Do you have any connection with that accident? 你和那次事故有关吗。 connected with 归纳拓展 be connected to和 „„ 相连 connect...with...把 „„ 和 „„ 联系起来 have connection with 与 „„ 有联系 in connection with 与 „„ 有关 be related to 与 „„ 有联系 have something to do with... 和 „„ 有关系 活学活用 The police have collected some information the murder. to with with connected with 解析 connected with the murder在句中作定语相当于定语从句 which is connected with the murder。 B crazy about...迷恋;热心于;醉心于 But there’s one thing I really love — football. 但是,我真的喜欢一件事情 —— 我非常喜欢足 球。 (回归课本 P3) 观察思考 The boy is crazy about/on skating. 那孩子对溜冰着了迷。 Turn the music is driving me ,它令我很心烦。 Hearing the shot,he ran like crazy. 听到枪声,他便拼命跑起来。 I’m crazy about 归纳拓展 It is crazy of sb. to do sth.=sb. be crazy to do be crazy for be crazy for be crazy about (doing) (做 )某事着迷 like crazy疯狂地;拼命地 drive sb. crazy逼得某人发疯 活学活用 She is so about Korean soaps that recently she began to study Korean. 解析 be crazy about对 „„ 着迷; addicted的搭配介词为 to; interested的搭配介词是 in。 C that’ s because I was stupid enough to play football in the 我太傻了,竟然在雨中踢足球。 That is why he was absent from school. 那就是他没来上学的原因。 You can’t be careful enough/too careful while driving a car,for traffic accidents happen frequently. 你驾车时再小心也不过 分,因为交通事故经常发生。 归纳拓展 (1)It’s/That’s because+ 从句表示“那是因为 „„”( 表原因 ), because引导表语从句。 相似句式: That’s why... 那是干 „„ 的原因 (表结果 ) (2)主语 +be+adj.+enough+to do „„ 能干 „„ 主语 +be+not+adj.+enough+to do „„不能干 „„ 主语 +can’t/hardly/never+be+ adj.+enough怎么做 „„ 也不过分 (=can’t be too+ adj.) 活学活用 (1)Although she did not know Boston well, she made her way to the Home Circle Building. enough easy enough easily 解析 本题考查副词及 enough to do句型。 根 据句子结构知此处应该用副词修饰动词 make, 且 enough作副词修饰形容词、副词及过去分词 时, enough要放在这些词的后面。 C (2)— I was walking along the street and suddenly,a car cut in and knocked me down. — You can never be in the street. enough careful carefully carefully 解析 考查句型:主语 +can’ t/hardly/ never+be+adj.+enough。 A 考题回扣 【 例 1】 Amy joined a painting group but didn’t seem to ,so she left. (山东高考) off up in over 解析 句意为: Amy参加了一个绘画班 ,但是 好像不适应,所以她就退出了。 show off炫 耀; go up上升。 fit in适应。 e over来访。 课文原文 I think I don’t get these things because I take a lot of exercise and am very . C fit 【 例 2】 Stand over there you’ll be able to see the oil pai。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。