高三英语introduction课件内容摘要:

. good for learning(vocabulary/reading/other courses )  2. good for future work(foreign enterprises, teachers,) advantage for English majors  3. good for personal development(thinking ability, perception ability, accuracy) 1. On writing  III: How to learn it well?  1. write a lot  2. Read a lot  3. Experience and think a lot the teacher has brought into the classroom?  Education objectives  Second Language Learning  L2 Writing  Technologybased context Education objectives (cognitive)  Bloom’s taxonomy (Bloom amp。 Krathwohl, 1956) knowledge prehension application analysis synthesis evaluation objectivist constructivist Epistemology  What is knowledge? objectivism constructivism Constructivism 1. Create authentic environments that provide a relevant context for the learning 2. Focus on developing realistic methods to solving realworld problems 3. Stress conceptual interrelations and multiple perspectives 4. The instructor coaches the students on strategies 5. Learning should be controlled by the learner The role of the tutor “ sage on the stage” “ guide by the side” objectivism constructivism Language learning  Krashen39。 s prehensible input hypothesis  (learning and acquisition)  Swain(1985) prehensible output hypothesis, that is “the opportunities to produce language were important for acquisition.”  Input and output are both important。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。