高一新教材定语从句复习内容摘要:

B. in that C. where D. on which 1. Do you know who lives in the building ______ there is a well? A. in front of it B. in front of whose C. in front of which D. in front which 2. I’ll never fet the day ____ I joined the League. A. on which B. in which C. which D. at which 3. Jean was her old friend, ____ she borrowed a necklace. A. from who B. from whom C. to that D. to whom 5. His glasses, _____ he was like a blind man, fell to the ground and broke its leg. A. which B. with which C. without which D. that 6. Do you。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。