高一上期中考试复习课件内容摘要:

ause • She looked at Jeff, who was waving his arms. • Before she could move, she heard a loud noise, which grew to a terrible roar. • The girl whose leg was broken in the earthquake was taken to hospital. The Attributive Clause that • All that can be done has been done. • Paris is the most beautiful city that I’ve ever seen. • The first museum that he visited in China was the History Museum. • What do you think of the people and the things that you saw in the country? • This is the very book that contains the information I need. 单元重点回顾 Unit 5 •take off/go wrong/ in all/ lock sb up/ run after/ bring sb back/on the air/ think highly of •accept/receive •owe sth. to sb. •关系副词引导的定语从句 (when, where, why) The Attributive Clause • This was the moment when Spielberg’s career really took off. • Chuck survives the air crash and lands on a de。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。