现在完成时仁爱英语内容摘要:

ave—be away from e/go back—be back begin be on join—be a member of /be in… eg. 1) The river has bee dirty. The river has been dirty for a long time. 2) My father has left Sanming. My father has been away from Sanming since last month. 3) The TV play has begun. The TV play has been on since two hours ago. scientist ______ from home for three months. A. has left away B. left away C. has been away Brown ____ in China since 1984. A. has been B. has e C. was grandma has _____ for three years. A. died B. been dead C. death. mother ______ in the school for a long time. A. begins to teach B. has taught C. has begun to teach 5. The interesting film ______ for some time. A. has been on B. began C. has begun. C A B B A Judge right or wrong: • I have bought a dictionary . ( ) I have bought a dictionary for two years. ( ) I have had a dictionary for two years. (。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。