牛津版高二英语主谓一致内容摘要:

the wall______ two large portraits. A. hangs B. hang C. hanged D. hanging (C85) 2. “News of victories _____ pouring in as our army advances,” the pany mander said. A. keep B. keeps C. kept D. have kept (C85) 3. There _____ a lot of milk in the bottle. A. are B. is C. were D. has (C86) 4. Zhang’s family ____ rather big, with twelve people in all. A. is B. are C. being D. was (C85) 5. Nobody but Jane。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。