基于单片机的篮球计时计分器设计自动化开题报告内容摘要:
nment and has good economic returns. Working principle of the system Parameters for fire detection This system chooses smoke and temperature as fire detection parameters. It has a plex fire detecting system posed of the smoke detector and the thermal detector. Composite detection can eliminate the interference and false alarm caused by nonfire signals which haven’t multiple signal parameters of the real fire. These signals include dust, water, gas and tobacco smoke. The overall system plan design The principle of the single chip microputer based automatic alarm and fire extinction system is shown in Figure 1. The system can be divided into two modules: signal acquisition module and signal processing module. Signal acquisition module Signal acquisition module consists of smoke detector, temperature detector and signal processing circuit. Smoke detector is mainly made up of infrared lightemitting diode and phototransistor. The light source is an infrared lightemitting diode, which generates highfrequency infrared radiation pulses by oscillation circuit. Phototransistor is fixed with a certain distance to the light emission point as an infrared receiver. When the fire occurs, a certain concentration of smoke enters the smoke detector. Then the intensity of the infrared light that the phototransistor received decreases, and the resistance of phototransistor increased. So the transistor bees conductive. After signal processing, the output voltage V1 decreases greatly. In the temperature detector with the positive temperature coefficient is used. After the fire occur, the temperature signal voltage V2 increases slowly along with the indoor temperature. Signal processing module The control part consists of the two major functional modules: A / D converter, the 8279 keyboard and the interface of the monitoring module. The smoke signal and the temperature signal after preamplifier get into the A / D converter. ADC0816 converts the analog signal into digital signal and sends to the CPU, which pares the digital signals with the settings in the program and determines whether to open the optical isolation so as to control the relays. These relays achieve optical alarm, sound alarm and highpressure nitrogen gas fireextinguishing. Connecting the 8279 chip with the CPU, an interface is expanded with a keyboard and an interface circuit of Monitor. The value of the alarm temperature is input through the keyboard and it will display on LED. Therefore, it achieves humanputer interaction and embodies the intelligence, which is another advantage of using microputer. Microcontroller circuit design the schematic diagram of the control circuit has been shown in Figure 2. It is mainly made up of the 8051 chip, 16channel A / D converter ADC0816, a 4 4 keyboard, a 4bit LED displayer and other interface chips In order to improve antijamming capability, several antijamming systems are designed relatively. The design of the interface between ADC0816 and 8051 chip in the system, interface circuit o。基于单片机的篮球计时计分器设计自动化开题报告
相关推荐
settime(void) { unsigned char flag。 time=0。 fen=time。 writtime()。 while(!flag) { if(0==K3) { delay(20)。 if(0==K3) { while(!K3)。 flag=1。 } } if(0==K1) { delay(20)。 if(0==K1) { while(!K1)。 . . time++。
示。 在增强型 MCS51系列中, 6 个中断源对应 8个中断请求标志(串行发送结束中断标志 TI和串行接收有效中断标志 RI相 “ 或 ” 后作为一个中断源—— 串行口中断,共用一个中断开关;定时器 T2溢出中断 TF2和外部触发中断 EXF2相 “ 或 ” 后作为一个中断源 —— 定时器 T2 中断,也共用一个中断开关)。 图 12增强型 MCS51 中断系统结构 增强型 MCS51定时
0 内部结 构主要由六部分组成:电源电路、 64 位光刻 ROM 及 1wire 接口、温度传感器、非易失性温度报警触发器 TH 和 TL、配置寄存器和 CRC 校验码产生器。 其内部结构如图 33 所示。 辽宁工程技术大学毕业设计(论文) 13 64位ROM 和单线接口存储器和逻辑控制器 高 速 缓 存存储器温度灵敏元件低温触发器TL高温触发器TH配置存储器8位 CRC生
数为: R=10KΩ, C=150PF, fCLK≈ 640KHz,转换速度为 100μs。 另外就是采样电流信号的采样电路,参考了相关的资料,设计的电路主要由两个 OP07运算放大器组成的差分放大电路,放大倍数约为一百倍,为了减少运放的失真,还专门设计了有 MC34063 构成的一个反向电路,用来给运放提供 5V 电压,然 后就是利用的一个 欧姆的水泥采样电阻来把电流信号转换成电压信号
ADC 的转换速度由ADC 控制寄存器中的 SPEED1 和 SPEED0 确定。 在使用 ADC 之前,应先给 ADC 上电,也就是置位 ADC 控制寄存器中的 ADC_POWER 位。 13 键盘、摇杆扫描电路 键盘、摇杆扫描电路如图 16 所示。 图 16 键盘、摇杆扫描电路图 空调遥控器按键功能设计解析:通过按下 A 键,会不断发送信号,这些信号包括温度,模式等所有信息的组合信号。
要加大宣传引导,通过多种有效形式,把并村的意义讲深讲透,把情况和政策讲清讲明,把利害关系讲细讲全,把纪律要求讲严讲实,以此来教育引导村干部、村民把思想统一到县委、县政府的决策部署上来,自觉服从大局、服从组织决定,不以任何借口影响和干扰改革;要组织干部进村入户、一对一、面对面宣传,帮助群众打消思想顾虑。 各乡镇党政主要领导要切 24 实履行维护稳定“第一责任”,对改革期间出现的苗头性、倾向性问题