高考英语定语从句的分隔干扰现象ivan内容摘要:

e。 where B. where。 that C. that。 where D. that。 that B 分析:该题考查的是含定语从句的强调结构。 where there is bomb 是定语从句,故正确的答案为 B。 6. 定语从句对独立结构的分隔。 With everything she needed ______ , she went home happily . buy B. buying C. bought D. buy 分析:该题考查 with复合结构的用法,其中定语从句 (that) she needed 的使用极容易干扰学生的思维,造成错选。 正确答案为 C。 C 1. The theory he stuck _______ true. A. to prove B. to be proved C. to proved D. to proving 2. Everything he _______ away from him before he returned to his hometown. A. took B. had been taken C. had had been taken D. had taken C C managers discussed the plan that they wo。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。