高考英语定语从句复习(苏教版)内容摘要:
an_____ nobody wants to work with______. ( 04 模拟训练) A. as。 him B. that。 / C. as。 / D. whom。 him 2. Mrs. Black took the police back to____ place ____ she witnessed the robbery. A. the same。 as B. the same。 where C. the same。 that D. as the same。 as ( 05 模拟训练) 1. I’ve e to the point where I can’t stand him. 2. The country is in the situation where a war will break out at any time. 我已经到了无法容忍他的地步了。 国家正处在随时有可能爆发战争的局势中。 where引导的定语从句先行词大多数情况下是 表示地点的名词,但也有特殊情况。 难点二:一些特殊词之后的 where 解析: 如果定语从句分别修饰 point, situation, part, condition和 case等表示抽象意义的词,常用 where 引导,意思是“到了某种地步,在某种境况中”。 are trying to reach a point ____ both sides will sit down together and talk. ( 06山东) A. which B. that C. where D. when 2. Do you have anything to say for yourself? Yes, there’s one point ____ we must insist on . ( 06江西) A. why B. where C. how D. / 高考题链接: 做题要灵活:要分析句子成分,选择恰当的关系词。 where\that is the library_____I borrowed the book. is from this library____I borrowed the book. where 定语从句 that 强调句型 综合考查一:定语从句与强调句 3. Where did you last see Mr. Smith? It was in the hotel____ I lived. A. that B. which C. where D. when 难点三 .综合考查 近年来,高考对定语从句。高考英语定语从句复习(苏教版)
相关推荐
e。 where B. where。 that C. that。 where D. that。 that B 分析:该题考查的是含定语从句的强调结构。 where there is bomb 是定语从句,故正确的答案为 B。 6. 定语从句对独立结构的分隔。 With everything she needed ______ , she went home happily . buy B.
ng cars. 社会应加强对学生的交通安全教育。 1. The students should be taught more about the traffic safety. 2. And also it is of great use to strengthen the safety education over the students. 较高级词汇 (Exercises 1)
类别。 注意: man表示 “ 人类 ” 时只能用单数,不能加冠词。 - Who invented ____ puter? - I don’t know. A. a B. the C. / D. one 定冠词的特殊考查要点 3 发明创造物前加定冠词 the。 ( 2020北京春) Summer in ___ south of France are for ____ most part dry.
pend . 看定语从句中动词与介词的搭配 up on 看定语从句中形容词与介词的搭配 He referred me to some reference books ______ which I am not very familiar. with 根据先行词判断,所用的介词与先行词 搭配 The rate ______ which wild animals are being
分析:从信息词“ early morning‖和“ sleepyeyed‖来判断,B. homes不符合逻辑,按生活经验,他们是去上班。 这时有些考生也许会认为,既然上班,就要去“挤公交车”或“去办公室”。 但上班的方式也有步行的、骑车的或坐地铁的,也有自己开车去的。 人们上班有去农场的、煤矿的,还有去工厂车间的,不一定去办公室。 因此, C. buses和 D. offices不符合生活实际。