高考英语定语从句(苏教版)内容摘要:
pend . 看定语从句中动词与介词的搭配 up on 看定语从句中形容词与介词的搭配 He referred me to some reference books ______ which I am not very familiar. with 根据先行词判断,所用的介词与先行词 搭配 The rate ______ which wild animals are being destroyed has increased. This is our cl。高考英语定语从句(苏教版)
相关推荐
an_____ nobody wants to work with______. ( 04 模拟训练) A. as。 him B. that。 / C. as。 / D. whom。 him 2. Mrs. Black took the police back to____ place ____ she witnessed the robbery. A. the same。 as B. the
e。 where B. where。 that C. that。 where D. that。 that B 分析:该题考查的是含定语从句的强调结构。 where there is bomb 是定语从句,故正确的答案为 B。 6. 定语从句对独立结构的分隔。 With everything she needed ______ , she went home happily . buy B.
ng cars. 社会应加强对学生的交通安全教育。 1. The students should be taught more about the traffic safety. 2. And also it is of great use to strengthen the safety education over the students. 较高级词汇 (Exercises 1)
分析:从信息词“ early morning‖和“ sleepyeyed‖来判断,B. homes不符合逻辑,按生活经验,他们是去上班。 这时有些考生也许会认为,既然上班,就要去“挤公交车”或“去办公室”。 但上班的方式也有步行的、骑车的或坐地铁的,也有自己开车去的。 人们上班有去农场的、煤矿的,还有去工厂车间的,不一定去办公室。 因此, C. buses和 D. offices不符合生活实际。
it out C. should have written it out D. ought to write it out A C ought to 相当于 should;此句的关键是“ He meant no harm”,显然指的是过去的事。 should have written 意指“本该写但实际上并没有写”。 3. There were already 5 people in the