高考英语句子复习内容摘要:
等连词连接组成一个简单句,但应注意主语和谓语动词的一致性。 The boss is flying to Paris. His secretary is flying to Paris. The boss and his secretary are flying to Paris. Both the boss and his secretary are flying to Paris. The boss is flying to Rome. His secretary is not flying to Rome. The boss but not his secretary is flying to Rome. The boss may be flying to Berlin. His secretary may be flying to Berlin. Either the boss or his secretary is flying to Berlin. The boss is not flying to York. His secretary isn’t flying to York. Neither the boss nor his secretary is flying to York. 主语、谓语、宾语的合并 两个简单句的宾语可由 and、 both…and 等连词连接组成一个简单句。 I met Jane. I met her husband. I met Jane and her husband. I met both Jane and her husband. It was cold. It was wet. It was cold and wet. I didn’t meet Jane. I didn’t meet her husband. I didn’t meet either Jane or her husband. I met neither Jane nor her husband. 两个或两个以上限定动词也可合并为一个简单句。 We sang all night. We danced all night. We sang and danced all night. 主语、谓语、宾语的合并 并列句 需把几个意思连接在一起时,可用分号或把两个或几个简单句用 并列连词 连接起来,这种结构即构成一个并列句。 用分号: We fished all day。 we didn’t catch a thing. 用分号,后跟一个连接副词: We fished all day。 however, we didn’t catch a thing. 用并列连词(如 and、 but、 so、 yet等 ) We fished all day, but (we) didn’t catch a thing. 并列句 常用并列连词 coordinating conjunctions • 平行并列连词 : • 转折并列连词: • 因果并列连词 : • 选择并列连词 : and, both…and, not only…but also, neither…nor, and then but, however, while, yet for, so or, either…or, neither… nor 并列句 并列句的词序: 并列句基本上保留了简单句的词序。 主语 谓语 宾语 连词 主语 动词 表语 Jimmy fell off his bike but (he) wasn’t hurt. 五种简单句型可用 并列连词 连接起来组成并列句。 主 谓 状(方式) 连 主 谓 表 Frank worked hard and (he ) became an architect. 主。高考英语句子复习
本资源仅提供20页预览,下载后可查看全文
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。
相关推荐
高考英语名词性从句(苏教版)
e there was a lot of traffic on the road. 同位语从句 在句中起同位语的作用 .一般放在名词 fact , news , idea , promise, thought , suggestion 等之后 ,用以说明或解释前面的名词 .引导词有连词 that。 少数情况下也可用连接副词 how when where 等 .如 : thought that
高考英语图表作文(苏教版)
结并得出结论。 In a word, the changes are the signs of the improvement in people’s lives. There is no doubt that there will be greater changes in people’s diet in the future. 图表作文的框架 As is shown /
高考英语反义疑问句(苏教版)
or, isn39。 t he? You must have studied English for three years, haven39。 t you? He must have finished it yesterday, didn39。 t he? It must be going to rain tomorrow, won39。 t it? 11) 感叹句中,疑问部分用 be +主语