高考英语倒装结构课件内容摘要:

keeps up with his English study. Child as he is, he knows something of electricity. Tired as he was, he continued to work. Young as she was, she was already director of a factory. 八 、 当 always, often, well, many a time等词放在句首时 , 后面常用倒装语序 , 如: Always did the soldier go to help the villagers. Often did we warn them not to do so. Well do I remember the day I saw a wild tiger. Many a time did he go swimming in the river. 注:上述所说的词不放在句首 , 不用倒装语序。 九 、 only所修饰的副词 、 介词短语或状语从句放在句首时 , 其后面的主语部分要进行倒装 , 如: Only in this way can you hope to improve the situation there. Only then did I realize that I was wrong. Only once did his father discuss his future with him. Only yesterday did I realize what was going on. Only after he came back was I able to see him. 注: only修饰主语 , 仍用自然语序 , 如: Only socialism can save China. 十 、 含有否定意义的副词 、 连词或短语构成的状语放在句首时 , 常用倒装语序。 这些词和词组有: not, never, hardly, seldom, little,。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。