高三英语完型填空第二讲内容摘要:

D. tinny 3) The ring had fallen of and been damaged in the great _____ of the fire. C. power。 ,句式灵活,结构复杂。 例: [NMET(1)2020] (when I was wait my food in a familiar restaurant) The man had a news paper 38 in front of him ,which he was 39 to read , but I could 4 0 that he was keeping an eye on me .When the waiter brought my 41 the man was clearly puzzled by the 42 way in which the waiter and I 43 each other . B. open 39. B. thinking 40. A. See B. find 41. D. food 42. A. direct C. strange 43. with B. looked at at about 为什么我们在这一题型上总是失分较多 ? 1. 没有严格遵循答题步骤 : 多数同学考试时担心时间紧 ,在没有弄清短文的中心和文章的情节线索的情况下匆忙答题 .事实上我们用在这一题上的时间可以达到 1516分钟 . 切记 :一定要用 23分钟时间进行缺词阅读 ,弄清文章大意和基本脉络后再着手逐个填空 . 2. 不注意积累答题 技巧 : a. 忽略文章中上下文之间的照应关系。 b. 遇到长句不注意分析句子结构 ,在语义模糊时抱碰运气的心理随意作出选择 . Practice :Do the cloze test in the paper. Practice makes perfect ! 1) The world39。 s population is being __7__. A. faster and faster B. more and more C.。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。