高三英语动名词精讲课件内容摘要:
inning / starting to boil. I’m starting to work on my essay next week. c. 在 begin 等后 , 非限定动词由某些状态动词构成时 ( 即:指心理状态或精神活动时 ) : She began to believe his story. He began to realize that he was wrong. d. 当主语是物 , 不是人时: The water started / began to boil. The ice started / began to melt. B. 在 need, want, deserve等后 , 可用动名词的主动式表示被动含义 , 或用不定式的被动式 , 意义上无差别。 但用动名词较为普遍 ,( 这时主语一般是物 ) , 如: The door needs oiling / to be oiled. C. 有的动词尽管可以用两种结构 , 但意义明显不同 , 须认真加以区别: I fot to close the door before I left the room. I fot having closed the door. He tried to write better. (尽量努力地写 ) He tried writing with a brush. (用毛笔试着写 ) I couldn’t help finishing it. (不能不结束某事 ) I couldn’t help to finish it. (不能帮助结束某事 ) They left off fishing. (停止钓鱼 ) They left off to fish. (离开某处出发去钓鱼 ) I regret to say that there is no wine in the bottle. (对现在要发生的事表示遗憾 、 抱歉 ) I regret not taking your advice. (后悔 ) ★ 动名词 ( 短语 ) 还常常跟在短语动词之后 , 作介词的宾语。 常见的有: insist on / think of / dream of / object to / hear of / prevent … from / keep … from / stop … from / feel like / be engaged in / look forward to / depend on / thank … for / excuse … for / devote … to / set about / spend … in / get (be) used to … / be fond of / be afraid of / be tired of / succeed in / be interested in / be proud of / burst out / give up 等 ,如: He insisted on seeing us home. They all objected to putting the meeting off. Are you interested in going to the show? I’m thinking of going to town this afternoon. I don’t feel like eating anything. She is afraid of falling behind the other。高三英语动名词精讲课件
本资源仅提供20页预览,下载后可查看全文
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。
相关推荐
高三英语写地方作文课件
s have got cars of their own. The people’s life here has bee rich and colorful. People from other countries e here. They can enjoy themselves travelling on holidays. To my delight, I can taste
高三英语介词复习课件
ongratulation (4)常与其他介词搭配的名词: prize for, respect for, victory over, struggle with 2. 形容词与介词的固定搭配 (1)与 at搭配的形容词: afraid, angry, good, bad, clever, surprised, excited, puzzled, frightened (2)与 of搭配的形容词
高三英语书面表达常用句型
Be 4) Have + S. + do + …? Will Shall Can May 5) Must + S. + do +…? Need Dare . 1) Were they busy yesterday? 2) Was there a pine tree beside the house? 3) Have you (got) any red ink? 4) Is