高三英语介词复习课件内容摘要:

ongratulation (4)常与其他介词搭配的名词: prize for, respect for, victory over, struggle with 2. 形容词与介词的固定搭配 (1)与 at搭配的形容词: afraid, angry, good, bad, clever, surprised, excited, puzzled, frightened (2)与 of搭配的形容词: afraid, sure, certain, full, tired, fond, proud, worthy (3)与 with搭配的形容词: angry, strict, careful, busy, popular (4)与 in搭配的形容词: weak, strict, rich, interested, successful (5)与 to搭配的形容词: next, good, polite, kind, cruel, rude, known, married, close, similar, due (6)与 for搭配的形容词: sorry, famous, fit, unfit, eager, anxious, hungry (7)与 from搭配的形容词: far, different, free, safe, absent, tired (8)与 about搭配的形容词: sorry, worried, anxious, careful, sure, Certain 【 注 】 ① 同一形容词与不同的介词搭配其含义会不同。  He was ti r e d of t h e wo r k . 他厌倦了那份工作。 He was ti r e d f r o m th e w o r k .他因工作而疲劳。  He is g o o d to h e r .他对她友好。 T h e a d v i c e is g o o d f o r h e r .这条意见对她有益。 ② of+抽象名词=形容词 of great value= very valuable of no use= useless a man of wealth= a wealthy man ③ to与情感名词连用 , 表示 “ 某种行动后产生的感觉 ” : to+ one’ s+ = to the of sb. Much to my joy, he was quite from danger. ④ at与某些名词搭配表示 “ 一 „„ 就 „„ ” at the sight of at the thought of deli ghtsu rp ris e deli ghtsu rp ris e 过 关 落 实 1. The manager suggested an earlier date ________ the meeting. A. on B. for C. about D. with 解析: suggest a date for为 (某事 )提议一个日期。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。