高一英语定语从句(苏教版)内容摘要:
ants the house the roof of which has fallen in. 关系副词引导的定语从句 • 关系副词 when, where和 why在定语从句中作状语,定语从句的先行词一般表示时间、地点 或 理由。 例如: • This is the place where we met each other. • The day will e when everyone lives a happy life. • The reason why he was late for school is now clear. • 定语从句分为限定性定语从句和非限定性定语从句。 • 非限定性定语从句一般只对所修饰的词作进一步说明。 如果现行词指人,用 who或 whom。 如果是指物,用 which。 • 关系代词在定语从句中作定语,用 whose。 • 如果指时间或地点,用 when或 where. • 非限定性定语从句不用 that引导。 • In this factory a worker, who works six hours a day, earns more than $1000 a month. • That river, which is 700 miles long, is in Shanghai. • She is the teacher who is good at singing. • We first went to Guilin, where we stayed for two days, and then went to Kunming. 1. He was a man. He did everything with care. 2. Buy some books. The。高一英语定语从句(苏教版)
相关推荐
欢愉 困扰 先天不足 不容置疑 风靡一时 货真价实 无的放矢 灿若群星 一统天下 为人诟病 词语(二) 把捉 抟造 启迪 侵蚀 衷情 交融 泛滥 畸形 呆滞 愚劣 昭示 雕琢 熟视 热衷 粗糙 简陋 削足适履 名噪一时 一脉相承 涂脂抹粉 刘半农《十四行集》之二十 有多少面容,有多少语声 有多少面容,有多少语声 在我们梦里是这般真切, 不管是亲密的还是陌生: 是我自己的生命的分裂,
生,不要难为情,这--你也不知道要发生这样的事情。 ‛ ‚ 是我写的。 ‛ 一个响亮的声音盖住了窃窃私语。 大家迅速把目光都投向了他--秦锐。 ‚ 请把信还给孟云,你没有权利扣留别人的信件,这是极不道德的。 ‛ 老师被这几句话惊呆了。 茫然若失地看着秦锐,秦锐像一头被激怒了的狮子,眼睛中似乎还含着泪花。 秦锐一个箭步跨过去,夺过老师手中的信,用力拆开其中的一封大声读道: ‚ 谢谢你的关心
既具有疑问含义, 又起连接作用,同时在从句中充当各种成分。 我们何时举行运动会还没有决定。 ________ we shall hold our sports meeting is not decided. 我不知道昨天谁打破了玻璃。 I don’t know _________ broke the glass yesterday. 我不知道他长的什么样子。 I have no idea
a strong beam of light。 full attention e) book in which a collection of stamps, photos can be kept, and records f) from the beginning to the end g) to a very great degree throughout extremely album