高一英语分词做状语内容摘要:
词 ___ in thought,he almost ran into the car in front of him. A. Losing B. Having lost C. Lost D. To lose C。 动词 ing或过去分词作状语 ,其逻辑主语应是 主句主语。 2.“陷入深思 ” 有两种表达法, A. lose oneself in thought B. be lost in thought 按句子提供的语境可用结构 B. ____ the general state of his health, it may take him a while to recover from the operation. A. Given B. To give C. Giving D. Having given 答案 A。 此处的 given是介词,意思是“鉴于,考虑到。 ” Δ有些过去分词在使用过程中已经转换成介词或连词,此时作状语已无法从逻辑主语一致来理解,此类过去分词要引起注意。 A 被用作介词或连词的分词: supposing假设 ,假如 ,设想 according to 按照 including包括 considering认为 granted认为 Supposing he won’t pass the exam, what should he do ? Many people including the old go to work without any pay on Saturday. According to his report, the situation is getting serious. Ex2 on P20 1. I was frightened by the loud noise. I went to see what was happening. Frightened by the loud noise, I went to see what was happening. 2. He was hit by the lack of fresh air. He got a bad headache. Hit by the lack of fres。高一英语分词做状语
本资源仅提供20页预览,下载后可查看全文
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。
相关推荐
高一语文不屈的普罗米修斯
《 伊索寓言 》 : 相传为公元前 6世纪希腊一个相貌奇丑但绝顶聪明的奴隶 伊索所作。 形式短小精悍,比喻恰当,形象生动,对后人影响较大,如 《 狼与小羊 》 、《 农夫与蛇 》 、 《 乌鸦与狐狸 》 、 《 龟兔赛跑 》 等。 • 古希腊最著名的抒情诗人:被柏拉图誉为“第十位文艺女神” 的萨福、阿拉克瑞翁、品达。 古希腊三大悲剧家: • 埃斯库罗
高一英语下册第一单元复习课件
ng to look for/be in search of/search for in return a lighted candle at war There is no doubt that…….. take apart consider doing 13依照某人。
高一英语上学期nelsonmandela
ily English for the Tyndale was put in prison and died for his ideas but his work was later used in the Bible. Mahatma Gandhi is the most famous Indian leader. He gave up a rich life for his ideas
高一英语wildlifeprotection(苏教版)
ons and it keeps balance of nature there. No rain forest, no animals and no drugs. 3). We should protect our young friends from being polluted in spirit. 1). Will this hat give protection against