捞渣机维护手册内容摘要:

尾部螺旋升起的装置有助于链条的张紧。 Buyer : Guangdong Guohua Yeudian Taishan Electric Power Plant Project : Taishan Power Plant Phase I 3 x 600MW CBMH Project No. C6196 Contract No. 2020RCC/13069UK Document No. C6196/MM/1 Operating and Maintenance Instructions 9 DESIGN PARAMETERS设计参数 Application应用 Furnace Bottom Ash Quantity 炉膛渣量 : tph normal /小时正常 : 20 tph maximum 20吨 /小时最大 Bulk Density of Wet Bottom Ash湿渣的密度 : 1300 kg/m3 Cooling Water Temperature 冷却水温 : 3338oC Boiler Expansion锅炉膨胀量 Direction X (towards sides of boiler)x方向 (锅炉两侧 ) : +/ 48mm Direction Y (towards front of boiler)y方向 (锅炉前侧 ) Front water seal plate前水封插板 10mm Rear water seal plate后水封插板 10mm Direction Z (towards down direction)z 方向 (下侧 ) :336mm Bottom Ash Hopper 渣井 Mounting 结构 :Self supporting portal frame structure自支撑结构 Gas Seal 密封 : Immersion of flap gates into SSC trough排渣门浸入 SSC水槽中 Ash Discharge排渣 :2 off Ash Hopper Openings 2套开口的渣井 Plate Material板的材质 : Carbon Steel 碳钢 Internal Lining内衬 : Refractory耐火曾 Hopper Spray Nozzles渣井熄火喷嘴 : 16 off 16套 Spray Water Quantity 喷嘴水量 : 30m3/hr intermittent 30m3/小时 间歇的 Seal Trough水封槽 Mounting结构 :On Bottom Ash Hopper structure在渣井结构上 Gas Seal密封 :Immersion of boiler seal plate 锅炉水封板浸入 Trough material 水封槽材质 : Stainless Steel不锈钢 Spray Water Quantity喷嘴水量 : Makeup 14m3/hr 补水 14m3/小时 冲洗水 Flushing 55m3/hr intermittent间歇的 Submerged Scraper Conveyor刮板捞渣机 Handling Rate出力 : tph normal operation正常 /小时 : 25 tph maximum operation最大 25 吨 /小时 Chain Size链条尺寸 : 36mm diameter直径 36mm Chain Speed链速 : Variable Flight Bar刮板 :200mm deep channel with wear strips 有耐磨条的 200mm深的槽钢 Conveyor Width (chain centres)传输宽度(链条中心距) :1800 mm Drive Type驱动类型 Twin Hagglunds CB280 Hydraulic CB280双轮液压驱动 SSC Chain Takeup Type捞渣机链条张紧类型 : Hydraulic液压 Casing Material箱体材料 : Carbon Steel碳钢 Buyer : Guangdong Guohua Yeudian Taishan Electric Power Plant Project : Taishan Power Plant Phase I 3 x 600MW CBMH Project No. C6196 Contract No. 2020RCC/13069UK Document No. C6196/MM/1 Operating and Maintenance Instructions 10 Horizontal Feed Trough Lining水平槽内衬 : Wear resistant plate 400 BHN耐磨板 Feed Incline amp。 Return Trough Lining斜升段和返回槽部分 : Basalt铸石板 Cooling Water Quantity冷却水量 : 50 –150 m3/hr Chain Cleaning Water Quantity链条清洗水 : 4 m3/hr Crusher (Unit 3)碎渣机( 3号机组) Handling Rate出力 : Normal正常 /小时 25tph Maximum最大 25 吨 /小时 Maximum Ining Material Size最大入料尺寸 :150mm x 150mm Crushed Maximum Material Size最大磨碎料尺寸 : 30mm Drive Type驱动类型 :Single Hagglunds CA50 Hydraulic CA50液压单轮驱动 Ash Conveyor (Unit 3)二级刮板 ( 3号机组) Handling Rate出力 : Normal正常 /小时 25tph Maximum最大 25 吨 /小时 Chain Size链条尺寸 : 26mm diameter直径 26mm Chain Speed链速 : Variable Flight Bar刮板 :150mm deep with wear strips有耐磨条的 150mm深 Conveyor Width (Chain Centres)传输宽度 : 700mm Drive Type驱动类型 : Variable Speed Electric Drive变速电驱动 Chain Takeup链条张紧 : Screw螺旋 Casing Material箱体材料 : Carbon Steel碳钢 Incline Trough Lining槽 体斜升段 : Basalt铸石板 Buyer : Guangdong Guohua Yeudian Taishan Electric Power Plant Project : Taishan Power Plant Phase I 3 x 600MW CBMH Project No. C6196 Contract No. 2020RCC/13069UK Document No. C6196/MM/1 Operating and Maintenance Instructions 11 SSC WATER REQUIREMENT捞渣机对水的要求 SSC Water Requirement捞渣机对水的要求 The following table provides the water requirement to maintain the SSC bath temperature at a certain set point under various ash rates and ining water temperatures. 下表表示了在捞渣机不同出力时的入水温度,槽体水温和流量 Ash Rate Water Inlet Temp Bath Temp Flow Required Tph出力 Deg C入水温度 Deg C槽体水温 m^3/hr所需流量 38 80 60 48 80 60 20 38 80 60 20 48 80 60 Additionally the following water flows are Chain Sprays链条冲洗水 4m3/hr (continuous) 4m3/hr连续 Seal Trough Makeup水封槽补充水 14m3/hr (continuous) 14m3/hr连续 Ash Hopper Quenching Sprays 渣井熄火喷嘴所需水量 30m3/hr (intermittent) 30m3/hr连续 Conclusion结论 1. Based on normal ash rate at 48 deg C water inlet temperature and maintaining the bath at 60 deg C, 25m3/hr of water is required to maintain the bath temperature. 正常出力时,入水温度是 48 C,维持槽体内水温 60 C所需流量是 25m3/小时 2. Based on maximum ash rate at 48 deg C water inlet temperature and maintaining the bath at 80 deg C, 96m3/hr of water is required to maintain the bath temperature. 在最大出力时,入水温度是 48 C,维持槽体内水温 80 C所需流量是 96m3/小时 The ining water supply should allow for the variation in water required in the range of 50m3/hr 150m3/hr. 入水流量应在 50m3/小时 150m3/小时范围内变动 . Seal Trough Flushing水封槽冲洗水 The separate supply for seal trough flushing of barg should allow for a maximum of 100m3/hr supply. 单独供给的水封槽冲洗水 barg允许的最大供给流量是 100m3/小时。 Buyer : Guangdong Guohua Yeudian Taishan Electric Power Plant Project : Taishan Power Plant Phase I 3 x 600MW CBMH Project No. C6196 Contract No. 2020RCC/13069UK Document No. C6196/MM/1 Operating and Maintenance Instructions 12 SECTION 2 第二部分 FUNCTIONAL DESIGN SPECIFICATION 功能设计说明 Buyer : Guangdong Guohua Yeudian Taishan Electric Power Plant Project : Taishan Power Plant Phase I 3 x 600MW CBMH Project No. C6196 Contract No. 2020RCC/13069UK Document No. C6196/MM/1 Operating and Maintenance Instructions 13 Project : Guangdong Guohua Yuedian Ta。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。