捞渣机维护手册内容摘要:
尾部螺旋升起的装置有助于链条的张紧。 Buyer : Guangdong Guohua Yeudian Taishan Electric Power Plant Project : Taishan Power Plant Phase I 3 x 600MW CBMH Project No. C6196 Contract No. 2020RCC/13069UK Document No. C6196/MM/1 Operating and Maintenance Instructions 9 DESIGN PARAMETERS设计参数 Application应用 Furnace Bottom Ash Quantity 炉膛渣量 : tph normal /小时正常 : 20 tph maximum 20吨 /小时最大 Bulk Density of Wet Bottom Ash湿渣的密度 : 1300 kg/m3 Cooling Water Temperature 冷却水温 : 3338oC Boiler Expansion锅炉膨胀量 Direction X (towards sides of boiler)x方向 (锅炉两侧 ) : +/ 48mm Direction Y (towards front of boiler)y方向 (锅炉前侧 ) Front water seal plate前水封插板 10mm Rear water seal plate后水封插板 10mm Direction Z (towards down direction)z 方向 (下侧 ) :336mm Bottom Ash Hopper 渣井 Mounting 结构 :Self supporting portal frame structure自支撑结构 Gas Seal 密封 : Immersion of flap gates into SSC trough排渣门浸入 SSC水槽中 Ash Discharge排渣 :2 off Ash Hopper Openings 2套开口的渣井 Plate Material板的材质 : Carbon Steel 碳钢 Internal Lining内衬 : Refractory耐火曾 Hopper Spray Nozzles渣井熄火喷嘴 : 16 off 16套 Spray Water Quantity 喷嘴水量 : 30m3/hr intermittent 30m3/小时 间歇的 Seal Trough水封槽 Mounting结构 :On Bottom Ash Hopper structure在渣井结构上 Gas Seal密封 :Immersion of boiler seal plate 锅炉水封板浸入 Trough material 水封槽材质 : Stainless Steel不锈钢 Spray Water Quantity喷嘴水量 : Makeup 14m3/hr 补水 14m3/小时 冲洗水 Flushing 55m3/hr intermittent间歇的 Submerged Scraper Conveyor刮板捞渣机 Handling Rate出力 : tph normal operation正常 /小时 : 25 tph maximum operation最大 25 吨 /小时 Chain Size链条尺寸 : 36mm diameter直径 36mm Chain Speed链速 : Variable Flight Bar刮板 :200mm deep channel with wear strips 有耐磨条的 200mm深的槽钢 Conveyor Width (chain centres)传输宽度(链条中心距) :1800 mm Drive Type驱动类型 Twin Hagglunds CB280 Hydraulic CB280双轮液压驱动 SSC Chain Takeup Type捞渣机链条张紧类型 : Hydraulic液压 Casing Material箱体材料 : Carbon Steel碳钢 Buyer : Guangdong Guohua Yeudian Taishan Electric Power Plant Project : Taishan Power Plant Phase I 3 x 600MW CBMH Project No. C6196 Contract No. 2020RCC/13069UK Document No. C6196/MM/1 Operating and Maintenance Instructions 10 Horizontal Feed Trough Lining水平槽内衬 : Wear resistant plate 400 BHN耐磨板 Feed Incline amp。 Return Trough Lining斜升段和返回槽部分 : Basalt铸石板 Cooling Water Quantity冷却水量 : 50 –150 m3/hr Chain Cleaning Water Quantity链条清洗水 : 4 m3/hr Crusher (Unit 3)碎渣机( 3号机组) Handling Rate出力 : Normal正常 /小时 25tph Maximum最大 25 吨 /小时 Maximum Ining Material Size最大入料尺寸 :150mm x 150mm Crushed Maximum Material Size最大磨碎料尺寸 : 30mm Drive Type驱动类型 :Single Hagglunds CA50 Hydraulic CA50液压单轮驱动 Ash Conveyor (Unit 3)二级刮板 ( 3号机组) Handling Rate出力 : Normal正常 /小时 25tph Maximum最大 25 吨 /小时 Chain Size链条尺寸 : 26mm diameter直径 26mm Chain Speed链速 : Variable Flight Bar刮板 :150mm deep with wear strips有耐磨条的 150mm深 Conveyor Width (Chain Centres)传输宽度 : 700mm Drive Type驱动类型 : Variable Speed Electric Drive变速电驱动 Chain Takeup链条张紧 : Screw螺旋 Casing Material箱体材料 : Carbon Steel碳钢 Incline Trough Lining槽 体斜升段 : Basalt铸石板 Buyer : Guangdong Guohua Yeudian Taishan Electric Power Plant Project : Taishan Power Plant Phase I 3 x 600MW CBMH Project No. C6196 Contract No. 2020RCC/13069UK Document No. C6196/MM/1 Operating and Maintenance Instructions 11 SSC WATER REQUIREMENT捞渣机对水的要求 SSC Water Requirement捞渣机对水的要求 The following table provides the water requirement to maintain the SSC bath temperature at a certain set point under various ash rates and ining water temperatures. 下表表示了在捞渣机不同出力时的入水温度,槽体水温和流量 Ash Rate Water Inlet Temp Bath Temp Flow Required Tph出力 Deg C入水温度 Deg C槽体水温 m^3/hr所需流量 38 80 60 48 80 60 20 38 80 60 20 48 80 60 Additionally the following water flows are Chain Sprays链条冲洗水 4m3/hr (continuous) 4m3/hr连续 Seal Trough Makeup水封槽补充水 14m3/hr (continuous) 14m3/hr连续 Ash Hopper Quenching Sprays 渣井熄火喷嘴所需水量 30m3/hr (intermittent) 30m3/hr连续 Conclusion结论 1. Based on normal ash rate at 48 deg C water inlet temperature and maintaining the bath at 60 deg C, 25m3/hr of water is required to maintain the bath temperature. 正常出力时,入水温度是 48 C,维持槽体内水温 60 C所需流量是 25m3/小时 2. Based on maximum ash rate at 48 deg C water inlet temperature and maintaining the bath at 80 deg C, 96m3/hr of water is required to maintain the bath temperature. 在最大出力时,入水温度是 48 C,维持槽体内水温 80 C所需流量是 96m3/小时 The ining water supply should allow for the variation in water required in the range of 50m3/hr 150m3/hr. 入水流量应在 50m3/小时 150m3/小时范围内变动 . Seal Trough Flushing水封槽冲洗水 The separate supply for seal trough flushing of barg should allow for a maximum of 100m3/hr supply. 单独供给的水封槽冲洗水 barg允许的最大供给流量是 100m3/小时。 Buyer : Guangdong Guohua Yeudian Taishan Electric Power Plant Project : Taishan Power Plant Phase I 3 x 600MW CBMH Project No. C6196 Contract No. 2020RCC/13069UK Document No. C6196/MM/1 Operating and Maintenance Instructions 12 SECTION 2 第二部分 FUNCTIONAL DESIGN SPECIFICATION 功能设计说明 Buyer : Guangdong Guohua Yeudian Taishan Electric Power Plant Project : Taishan Power Plant Phase I 3 x 600MW CBMH Project No. C6196 Contract No. 2020RCC/13069UK Document No. C6196/MM/1 Operating and Maintenance Instructions 13 Project : Guangdong Guohua Yuedian Ta。捞渣机维护手册
相关推荐
个操作对象进行大小比较的运算符,是逻辑运算的一种简单形式。 (高 ) = = (低) != == 2.关系表达式:用关系运算符将两个表达式连接起来的符合 C 语法规则的式子 3.关系表达式的运算结果是一个逻辑值,即 “真 ”或 “假 ”。 在 C 语言中关系运算结果为真,以整数 “1”表示,结果为假,以整数 “0”表示。 4.关系运算符的优先级低于算术运算符的优先级,且等于( ==)和不等于(
2月中旬~ 4月上旬),以土壤 10cm~ 20cm地温稳定在 10℃以上为春栽的适宜时期;秋栽在苗木质化后至土壤结冻前( 10月~ 11月)为好。 时间以早栽为好,苗木失水少,易于成活,来年春发芽早,生长快。 掌握在土壤结冻前一个月最佳,地上部分剪留20cm~ 30cm,秋栽后埋土越冬。 据当地降水量。 雨水充沛,在垄上开穴;雨水偏少,在垄内开穴。 掌叶覆盆子 大田栽植可等行等穴
物,转角符合设计要求。 7. 开挖沟槽达设计标高时,应立即报监理验收并做土工试验,检查合格后应尽 快进行基底垫层施工,以防渗水浸透基底。 8. 基底土质与设计不符时,应报监理、业主研究讨论,由业主、监理、设计和施工单位共同商讨加固措施。 9. 开挖完成后,应及时做好防护措施,尽量防止基底土的扰动,并应尽快组织进行基底垫层施工。 夜间开挖时,应有足够的照明设施,并要合理安排开挖顺序,防止错挖或超挖
数及碎石用量。 且当天进行碎石用量及施工延米的总量复核。 根据总体的施工进度安排,对每台桩机每天进行进度复核,有问题的桩机及时查明原因,在确保施工质量的前提下,确保按工期完成施工任务。 资料的整理及报送:施工资料由专人每天收集整理,对每台桩机建立独立完整的施工记录台帐,施工过程中资 料每天向监理 工程师 报送。 四 、具体施工质量保证措施 桩位的放样:应严格按设计图纸进行放样
标及质量保证措施 34邹壶惑摄雍容震造齿得苟执缨耕纺掉彭纯谜除砾留根获苑盟经疯亭贝蔬叛垫传妥加飘旨夕柞下铲俞牌陕撬尿肩励臀巡纯整拥孵纵暴辆蓉伤镐门醉扳 5) 、本工程的经营宗旨是“保本、微利、求发展”。 0115 重庆市江北区委办公大楼装饰工程施工组织设计 1目录第一章 编制依据及说明 3第二章 编制原则 3第三章 工程概况 4第四章 施工部署 5第五章 施工准备 11 第六章 施工协调管理