建筑模型制作材料大全22698字投稿:范墂境内容摘要:
4) /单头 (A4) / single head ( A5) /双头 (A5) / double head 规格型号 Spec. ( A7) /双头 head 只 piece 只 piece 只 piece M06010301 布艺床(白色 +黑色) Clothing fabric bed (white + black) M06010401 布艺床(红色) Clothing fabric bed (red) M06010502 拼花木片 Matching wooden pieces 单位 Unit 个 piece 只 piece 个 piece 編碼 Code M06010702 红色绒布 物料名称 Material Name Red cotton flannel Light for couryard (A7) / double 小夜灯 Little night light 路灯 1: 100 Sidewalk light 1:100 1: 100 M06030000 M06021000 文化石 Culture stone 小木桥 Small wooden bridge Sidewalk light 1:150 路灯 1: 200 Sidewalk light 1:200 路灯 Sidewalk light 七彩灯 Colourful light piece Chinese checkers 1: 200 个 piece M06022020 介刀 Paper cutting knife 只 piece 个 piece 棵 cluster 个 piece 棵 cluster 个 piece 个 piece 个 piece M06020200 M06020700 M06020300 钩刀 Bush hook 剪刀 Scissors 凿刀 Chisel 三闪灯 5mm(共阴) 5mm(共阴) Flashing light 5mm 5mm (mon (mon cathode) 蝴蝶灯 Butterfly light 蝴蝶灯 Butterfly light 绿色蝴蝶灯 Green butterfly light 白色小蝴蝶 White butterfly light 串灯 Cluster light 不锈钢射灯 Stainless Steel Spot Light 24W灯架 24W Light hanger T5/35W 灯架 T5/35 Light hanger 6W灯架 6W Light hanger 8W灯架 8W Light hanger T4/20W白色灯管 tube 16W黄色灯管 16W Yellow light tube 带镇流器 with ballast 带镇流器 白色 /带镇流器 White/ with ballast 220V 白色 White cathode) 黄色 Yellow 兰色 Blue 绿色 Green D01030009 D01030005 D01030004 螺丝刀 Screw driver 三角锉刀 Triangle file 电刨刀刀片 Electricity planner cutter blade D01030001 不锈钢剪刀 Stainless steel scissors D01050000 刀棒 Knife stick in engraving machine 个 piece, 套 set 套 set 套 set 套 set 支 piece 只 piece D01052200 刀棒(柱刀) Knife stick in engraving machine (sharp) D01042400 大刀片 Blade in big size D01043500 D01040600 D01040800 D01012020 钩刀片 Bush hook blade 切纸刀 Paper cutting knife 铁锤 Hammer 沙轮 Sand wheel T4/20W White light with ballast D01011609 玻璃枪 Glass gun 416W Ballast 32W镇流器 32W Ballast 3V兰二极管 3V Blue Diode 3V绿二极管 3V Green Diode 3V黄二极管 3V Yellow Diode 3mm 绿二极管 3mm Green Diode 二极管 IN4007 Diode IN4007 3V红二极管 3V Red Diode 3V 方形二极管 3V Square Diode 3V 二极管 3V Diode 3V兰色二极管 3V Blue Diode 3V黄色二极管 3V Yellow Diode 黄色二极管 Yellow Diode 红色二极管 (无边 ) 绿色二极管 5mm Green Diode 5mm 二极管 (贴片 ) Diode (patch) 二极管 (贴片 ) Diode (patch) 二极管 (贴片 ) Diode (patch) 二极管 (贴片 ) Diode (patch) piece Portable electric motor saw 3V兰(有边) 3V Blue (with edge) 3V绿(有边) 3V green (with edge) 3V黄(有边) 3V Yellow (with edge) 3mm/无边 3mm/ no edge IN4007 3V 红色 3V Red 蓝色(2x3x4) Blue 绿色 (Ф10mm) Green (无边) (No edge) (无边) (No edge) 直径 2mm Diameter 2mm 直径 3mm 直径 5mm Diometer 5mm 0805红色 0805 Red 0805 白色 0805 White 0805 兰色 0805 Blue 0805 黄绿 0805 Yellow green 个 piece 个 piece 个 piece 个 piece 个 piece 个 piece 个 piece 个 piece 个 piece 个 piece 个 piece 个 piece 个 piece 个 piece 个 piece 只 piece 只 piece 只 piece D08003200 D02020305 吸尘器 Dust collector 玻璃夹 Glass clamp D02020304 内六角扳手 Inner hexagon spanner D02020309 封箱器 Case sealer D02020304 射钉枪 Power actuated setting device D02040700 D02040303 D02040305 D02040304 D02020305 D02020309 D02040209 D02020303 D02040504 D02030003 D02030001 D02030005 D02030004 灰刀 (大 ) Putty knife (big size) 胶钳 Rubber clamp 热胶枪 Heating glue gun 喷枪 /宁波 W71 Spray gun/ ningbo W71 电炉 Electricity oven 电钻 Electricity drill 烙铁头 Solder horn 烙铁蕊 60W Soldering iron core 60W 斜口钳 Diagonal cutting pliers 漏斗 Funnel 吹尘枪 Air dust blow gun 曲线锯 Curved saw 半圆锉 Pitsaw file Red Diode (No edge) Diameter 3mm Red butterfly 5A开关 5A Switch power 6A开关 6A Switch power 15A 气泵开关 15A Pump switch 空气开关 Air power switch 按钮开关 Button switch 启动开关 Start switch 行程开关 Travel switch 物料名称 Material Name 电源线 Power cord 开关电源 Switch power 开关电源 Switch power 船型开关 Hull Switch 开关电源 Switch power 电机(万宝金) Electrical motor (Wanbaojin) 同步电机 Synchronous machine 电机(松下) Electrical motor (Panasonic) 电机40W Electrical 40W 定向同步电机 Directive synchronous machine Red 5A piece 个 piece D03000500 Electric welding rod 射钉枪 Power actuated setting device 6A(圆形) 6A (circle shape) 15A 常用 normal 10A 规格型号 Spec. 3 头 3 heads 12V5A 5V/12A 5V/6A FF050SH 个 piece 个 piece 个 piece 个 piece 只 piece 个 piece 单位 Unit 根 piece 个 piece 个 piece 个 piece 个 piece 个 piece D03000600 D03021500 D03020200 D03010000 D03050000 D03050001 編碼 Code D04030000 D03051200 D03050500 D03050002 D03050600 D16050000 网线钳 Netting wire pliers 扳手 Spanner 磨沙机 Frosting machine 搅拌机 Stirring mill 自动升降机 Automatic elevator 电焊机 Welding machine 物料名称 Material Name 40W电烙铁 40W Electric iron 40W烙铁芯 40W Soldering iron core 网塞 /小的 Stopper/ small size 尖嘴钳 Long flat nose pliers 灰刀 (小 ) Putty knife 草粉 142 Grass powder Ф60 个 piece D16600000 草粉 101。建筑模型制作材料大全22698字投稿:范墂境
相关推荐
话 C a) 在消防控制室与所有消防电话、电话插孔之间互相呼叫与通话,总机应能显示每部分机或电话插孔的位置,呼叫铃声和通话语 音应清晰 ,对无法满足上述功能的电话线路进行维修。 b) 消防控制室的外线电话与另外一部外线电话模拟报警电话通话,语音应清晰。 对不清晰电话及线路进行核查、检修。 c) 检查群呼、录音等功能 是否 符合要求。 不满足时,联系专业厂家进行增设。 防火分隔设施 防火门 组件;
配电室、消防控制室、消防水泵房、防烟排烟机房、消防用电的蓄电池室、自备发电机房、电话总机房以及发生火灾时仍需坚持工作的其它房间,其工作面的照度不应低于正常照明时的照 度。 月 4 疏散 指示标志 灯 抽 查外观的完好情况、位置、指示方向。 标志表面干净、无遮挡、指示方向正确。 安装高度( 疏散指示标志灯安装在 疏散走道 1m 以下, 安全出口标志灯安装在 安全出口和疏散门的正上方。
防排烟系统 序号 检测项目 技 术 要 求 大商业 LT16(E)楼梯间送风口风量≥ 25000 m3/h; 大商业 LT16(F)楼梯间送风口风量≥ 25000 m3/h; 大商业 LT17(A)楼梯间送风口风量≥ 25000 m3/h; 大商业 LT17(B)楼梯间送风口风量≥ 25000 m3/h; 大商业 LT18(A)楼梯间送风口风量≥ 25000 m3/h; 大商业
层的。 塑料地面: 包括一切有有机物质为主所制作的地面覆盖材料。 装饰效果好,色彩选择性强,施工简单,清洗更换方便,塑料地面还有一定弹性,脚感舒适,轻质耐磨,但他有易老化、日久失去光泽、受压产生凹陷,不耐高热、易留划痕等缺点。 涂料地面 :施工方便,造价较低,可以提高地面耐磨性和韧性以及不透水性。 使用与民用建筑中的住宅、医院等。 顶棚构造有哪几种类型。 P81 直接顶棚 ,包括一般楼板板底