土方开挖、基坑支护专项施工方案(经专家论证内容摘要:
o business 980 car t im es, and Ar chives cor rections 81 pieces t im es, and issued t est qualif ied logo 25, 429 car t im es, and ot her vehicles business 3,640 car t im es。 supervision Sur vey Sect ion r elies on m otor vehicle det ect ion r emot e issued t est qualif ied logo sof t war e plat for m super vision m otor vehicle t est, and ident ifcat ion sit uation 7418l iangci, invest igat ion m ot or vehicle exception business 30 car t im es, his par ds business war ning 244 ar ticle, vehicles and dr iving people sound video r egulator y scr eenshot s 1852 Zhang, checks m otor vehicle ar chives 716 pieces t imes, and m edium bus, and medium above t r uck, and Of hazar dous chemicals, vehic les and school buses and ot her key vehicle inspection r ecor d of 420. (C) based on t heir own, and str ict adherence t o def ense, mor e cheat ing, f alse f alse f ugit ive suspect s, r obber y suspect vehicles and t he I nter cr ackdown. DM V f ul play t o t he f ir st line of Def ense posit ion cont rol, investigat ing cheating, f ake ident if icat ion and r obber y suspect vehicles t hr ough oper ational wor k, and car ef uly exam ine t he document s and legal pr oof , check t raf fic violat ions, t r af fic accident s, t he fugit ive suspect suspected vehicles and t heft t han t o wor k, fur ther t ight car , dr iving m anagem ent business f or malit ies r eview pr ocedur es. . Truc k dr iver inf or mat ion m anagement plat for m. Mot or vehicles and t r af fic police depar t ment s, St at e t ranspor t author it y t o f ur ther clar ify t he Division of labour , im plem ent ation r esponsibilt y, st r engt hen our colabor at ion and m anagement oget her , r einf orcing t he m anagement of dr iver s on which st r ongly synthet ic war far e and inf orm at ion war f are. 3 st r ict ly im plement ed. Fr om M ay 1 up, a is im plem ent ed plex r oad and bad weat her dr iving exam , cur rent ly DM V is ur ged cont r act ors par ty in t r easur es dr iving school incr eased sim ulat ion Highway, and continuous ur gent det our s, and snow days, and wet sliding r oad, and bur st sit uation disposal, subjects I I f ield t o dr iving exam pr oject, is expected2 编制 单位:苏州 建鑫建设集团有限公司 编制时间:二零 一 叁 年 九 月 目 录 1 编制依据 ...................................................... 5 2 工程总体情况 ................................................... 6 工程概述 .......................................................... 6 周边环境 .......................................................... 6 工程地质条件 ...................................................... 7 水文地质条件 ...................................................... 9 基坑围护及降水设计概况 ............................................ 9 3 施工部署 ..................................................... 15 项目 管理目标 ..................................................... 15 施工进度计划 ..................................................... 15 项目组职机构 ..................................................... 13 施工准备主要资源配置计划 ......................................... 13 施工用电计划 ..................................................... 18 劳动力计划 ....................................................... 19 工程施工顺序 ..................................................... 20 4 土方开挖施工方法 .............................................. 21 土方开挖概述 ..................................................... 21 土方施工方法 ..................................................... 19 土方开挖过程中应注意的问题 ....................................... 20 工程桩保护措施 ................................................... 21 5土钉墙 施工及技术质量措施 ......................................... 22 施工技术要求 ..................................................... 22 土钉墙施工工艺流程 ............................................... 23 evaluat ion of scient if ic developm ent . Nat ur e securit y t ypenat ur e securit y is t o m aint enance people of healt h value f or t ar get, t hr ough st rengt hening secur it y based m anagem ent , and r is k m anagem ent , and equipm ent m anagem ent and t echnology super vision, ensur e pr oduction in t he people, and r eal, and syst em, and syst em , elem ent s ecurit y r eliable, and harm ony unif ied, f ul cont r ol var ious against f act or s, achieved t hought no slack, and m anagem ent no em pty docum ent, and equipm ent no hidden, and syst em no blocked, and unit zer o nonst opped. Qualit y and ef f iciencyqualit y benef it is t o adher e t o t he ent er prise sur vi al, pr ofit and developm ent business t r uth, adher e t o t he all act ivit y is econom ic activit y, all cost s can be cont r oled, m oney should not be wast ed m anagem ent philosophy, m anagem ent analysis, t o im pr ove m anagem ent qualit y, im pr ove cost cont rol capacit y and m ar ket c om petit iveness. I nnovation of science and t echnology science and t echnol gy innovat ion is t o play t he r ole of science and t echnology as t he pr imary pr oduct ive f orce, active use of new t echnologies, new m at er ials, new pr ocesses, new equipm ent, incr ease invest ment in science and t echnology, str engthening scientif ic and t echnological t r aining, speeding up t ransfor ming scient if ic and t echnological achievement s, f orm ing a number of propr iet ar y t echnology, enhancing core pet it iveness. Resour ce savingt her esour ces saving enter prise was t o r educe coal consumpt ion, wat er consum pt ion, electr icit y at t he cor e, enhance t he oper ation of lean m anagem ent t o r ealize low consum pt ion, high ef ficiency, r educe production cost s. Second is t o st r engt hen t he business, f inancial, m at er ial, inf or mation and t he opt im ization of or ganization and m anagem ent , s aving t he int ernal t r ansact ion cost s. Har monious development of har monious development is t o const ruct a f or eign envir onm ent f or dev。土方开挖、基坑支护专项施工方案(经专家论证
相关推荐
板 √ 合格 2 二号楼一层飘窗、楼梯、构造柱、现浇板 √ 合格 3 三号楼一单元底框柱子 √ 合格 4 三号楼二单元底框柱子 √ 合格 5 三号楼三单元底框柱子 √ 合格 6 三号楼一单元底框梁、板 √ 合格 7 三号楼二单元底框梁、板 √ 合格 8 三号楼三单元底框梁、板 √ 合格 9 一号楼二层飘窗、楼梯、构造柱、现浇板 √ 合格 10 二号楼二层飘窗、楼梯、构造柱、现浇板 √ 合格 11
:挖土应从场地东侧开始,由北向南依次循环进行。 挖土前,应由放线员用白灰准确放出挖土边线,本次挖土不考虑放坡,基础梁及承台两侧留 400mm 工作面,挖土时,测量人员应跟踪检查,随时测量标高,严禁超挖。 以上所有挖出的土方全部采用自卸汽车运至指定 卸土场,运距 1000m,当挖至 ,放线员应再次在 平面上准确放出承台及基础梁的人工挖土线。 以下至设计标高采用人工挖土
3.实习生在在实习开始后的一个月内上报 实习基本情况 汇报 表( 附件 4)给指导老师,内容包括 工地基本情况、工地电话、自己电话(联系方式)、家庭电话 等。 4.实习学生每周的 日志 及总 结以书面形式 (或电子邮件 )寄给指导教师。 5.教师 根据 学 生 实习 日志 及总结及时进行交流讨论并总结,对不认真负责的学生,将与其家长、本人或工地联系以了解情况并提出要求,实习生连续二周出现该问题的
箍筋等,没有被混凝土包裹而外露。 ( 2) 保证措施 1) 浇筑混凝土前,应检查钢筋位置和保护层厚度是否准确,发现问题应及时修整受力钢筋的混凝土保护层厚度。 2) 为保证混凝土保护层的厚 度,要注意固定好垫块,一般每隔 1m左右在钢筋上绑一个同标号细石砼垫块。 3) 钢筋较密集时,应选配适当粒径的石子。 石子最大颗粒尺寸不得超过结构截面最小尺寸的1/4,同时不得大于钢筋净距的 3/4
,宽 13m,正交 K2+4500 射击场路(规划京周公路),现状道路宽 8m,规划红线宽 60m K2+480~ K3+070 永定河,正交 K3+110 西五环路,现状道路宽 32m,红线宽 80m,正交 K3+600 规划梅市口路,规划红线宽 60m,从路中跨入路 侧 K3+950 丰沙铁路,现状 6 股道,总宽 36m、斜交 8 8度,设计基本地震加速度值为。 平原地区标准冻结深度为。