储罐安装、焊接施工方案内容摘要:
小于 200mm; The distance between longitudinal weld joint of bottom shell and butt weld joint of tank bottom baseplate is not less than 200mm。 罐壁开孔接管或开孔接管补强板外缘与罐壁纵向焊缝之间的距离不得小于200mm,与环向焊缝之间的距离不得小于 100mm; The distance between tank wall open pipe and open reinforcement plate outer edge and tank wall longitudinal weld is not less than 100mm。 包边角钢对接接头与壁板纵向焊缝之间的距离不得小于 200mm; The distance between angle iron butt weld joint and shell longitudinal weld joint is not less than 200mm。 壁板尺寸允许偏差应符合下表规定: Allowance deviation of shell size shall accord with following specification: 测量部位 Measure position 环缝对接 Circumferential joints butt welding (mm) 板长 Plate length AB (CD≥ 10m) 板长 Plate length AB (CD10m) 宽 度 Width 177。 177。 1 长 度 Length 177。 2 177。 对角线之差 Diagonal difference |ADBC| ≤ 3 ≤ 2 直线度 Alignment ≤ 1 ≤ 1 ≤ 2 ≤ 2 壁板在卷板机上进行卷制,辊的轴线与壁板长边相互垂直。 为了防止产生直板可加带头板。 壁板卷制后应立置在平台上检查,垂直方向用直线样板检查间隙不得大于 1mm,水平方向用弧形样板,其间隙不得大于 4mm; Shell plate shall upright lie on the platform to check with templet. For the vertical to check with straight templet and its gap is less than 1mm. For the level to check with arc templet and its gap is less than 4mm。 壁板坡口用坡口机加工,纵缝坡口尺寸按图纸要求进行,环缝开单面 V 坡口。 C A B D F E 上海 SECCO90 万吨 /年乙烯工程 26 万吨 /年丙烯腈 (AN)装置 储罐安装 \焊接施工方案 中国石化集团第五建设公司 Page 9 of 34 上海工程项目部 Edge preparation of shell plate adopts edge planner and the actual size shall accord with the design requirements. 拱顶预制 Prefabrication of domed roof 拱顶预制前依据施工拱顶图绘制排板图且符合下列规定: Draw typesetting sketches of domed roof accord with construction domed roof drawing before fabrication the domed roof and conform to following provision: 顶板任意两条相邻焊缝的间距不得小于 200mm; Distance between every two conterminous weld joint on domed roof is not less than 200mm。 瓜皮板自身拼接采用对接接头,并采用双面焊接; Weld of domed roof plates adopts butt weld. When assemble with many pieces of plates according to specification of material delivered, domed roof plates shall be formed on platform and adopts bothside welding, plates shall be smooth after welding. 瓜皮板下料前按施工图放大样,确认无误后方可切割; Confirm domed roof plates and cut they according to amplified construction sample drawing before construction。 拱顶加强肋,应进行冷煨加工,成型后用弧形样板检查,其间隙不得大于 2mm; Domed roof reinforce rib shall cold roast and check with arc templet after formation, its gap is less than 2mm。 加强肋接头部位必须完全焊透; Reinforce rib tie shall be perative welded。 加强肋与顶板组焊应在拱顶支架上进行,并按图样要求,先放置径向加强肋,后放置环向加强肋。 Weld of reinforce rib and top plate shall be on mould and meet drawing requirements. Lay radial reinforce rib firstly, then connect ringed reinforce rib, rib and top plate shall be tight. 瓜皮板预制成型后,用弧形样板检查,其间距不得大于 10mm; Check the domed roof plate with arc templet after formation and its gap is less than 10mm。 6. 安 装 Installation 采用目前国内较先进的液压顶升倒装法施工工艺,在罐内沿圆周设置提升架,用托架将罐体、罐壁胀圈与液压顶升机连接在一起,在罐内设液压泵站,用胶管通过液压元件把各液压顶升装置连起来,在高压油的作用下将罐体升起。 此工艺优点是:工序简单 ,操作稳定可靠,高空作业少施工安全性能好,脚手架搭设少能明显提高工效,确保施工质量。 底板、壁板和顶板用 50 吨履带式吊车吊装。 Adopt advance hydraulic pressure lift adverse installation process and placidly lift storage tanks with hydraulic pressure lift machine. Merits of this process are: procedure is simple。 operation is steady and reliable。 construction is safe。 effect is clearly increased。 quality is insured. 底板组装 Assemble of tank bottom 底板铺设前,其下表面应设计文件要求进行刷油防腐,不锈钢不刷油。 上海 SECCO90 万吨 /年乙烯工程 26 万吨 /年丙烯腈 (AN)装置 储罐安装 \焊接施工方案 中国石化集团第五建设公司 Page 10 of 34 上海工程项目部 Before laying carbon tank soleplate, its underside shall paint according to design requirements, and not paint in 40mm from each edge. 在基础上划出两条互相垂直的中心线,并且划出每块中幅板的位置,这样有利于铺设; 先铺罐底中心板,在中心板上划十字线,十字线与罐基础中心线重合,在十字线中心打上样冲眼,并应做出明显的十字标记; Draw reticle on tank bottom center plate according to typeset chart, the reticle and tank foundation centerline overlaps. Drilling in tank center and marking. 由罐底中心板向两端逐块铺设中间一行中幅板,然后从中间一行板开始,向两侧逐行铺设中幅板,每行中幅板应由中间向两侧依次铺设;中幅板搭接长缝可点焊或用角钢斜铁固定, 每块板不少于 2 处。 三层板重叠处,将上层板覆盖的角焊缝先焊接完毕,上层板应切角处理,具体尺寸见各施工图。 Lay channel plate from tank bottom center plate to both side. Welded before the third plate laid. 铺设时,宜先铺设中幅板,后铺设边缘板。 中幅板与中幅板搭接,中幅板与边缘板搭接,应按图纸要求进行搭接,搭度允差为177。 5mm。 Lay channel plate firstly, then lay edge plate. If soleplate require join connection, connect according to the requirement, allowance deviation is177。 5mm。 边缘板铺设前背面相同一侧点焊垫板,垫板规格与材质依据图纸要求。 Spotwelding the cushion plate on the same side of edge plate. 弓形板边缘板的对接接头采用不等间隙,外侧间隙为 e1=4~5mm,内侧间隙为e2=7~8mm; Butt connection of arc rim plate adopt unequal gap, outer gap is e1=4~5mm,inner gap is e2=7~8mm。 壁板组装 Assemble of shell 在罐底上以罐底中心板十字线中心为圆心,划出底圈壁板安装圆,在内径处焊上定位角铁,将十字线延长到边缘板上。 Draw top shell installation circle on tank bottom, center is tank center, radius accord with following: 最上二(三)带板施工完,在罐内安装液压顶升装置。 After the top shell assembly and vault, assembly Hydraulic pressure lift machine in 180186。 南 S 270186。 西 W 90186。 东 E 0186。 北 N e1 e2 上海 SECCO90 万吨 /年乙烯工程 26 万吨 /年丙烯腈 (AN)装置 储罐安装 \焊接施工方案 中国石化集团第五建设公司 Page 11 of 34 上海工程项目部 tanks. 起重重量(最大起重重量)计算: Calculation of lifting weight: T=K*(罐体总重-罐底重量-第 1 层壁板重量 +附件重量 ) T=K*( total tank weight- tank bottom weight- 1st layer shell weight + appurtenance weight) 附件重量取① 5000Kg(容积大于等于 3000m3);② 3000Kg(容积小于 3000m3)。 K 取 (安全系数) appurtenance weight approximately 4000Kg, K approximately ( Safety coefficient) 名 称 Name 位 号 Item 全容积Specification( m3) 规 格 Type( mm) 提升重量 Lifting weight( t) 顶升机数量Number of lift machine( set) 丙烯腈成品中间罐An product rundow。储罐安装、焊接施工方案
相关推荐
相对高的芳烃选择性。 因此,烷烃在形成芳烃时显示出最低的反应速率和最差的选择性。 烷基环戊烷,虽然其反应速度和选择性比烷烃要好一些,但生产芳烃量较少。 烷基环 己烷迅速、完全地转化为芳烃。 四、反应热 烷烃转化成环烷烃、环烷烃转化成芳烃、烷烃加氢裂化的反应热见表 1- 表 1— 3 典 型反应热 反应 反应热( kcal/molH2) 烷烃 环烷烃 + 吸热反应 环烷烃 芳烃 + 加氢裂化 -
拆卸。 合作期间,发生下列事件,由乙方负责,甲方不承担任何责任: ( 1)非因甲方 的原因 造成摇摆机被盗、丢失和人为损坏, 乙方应在事情发生后 2 日内全额向甲方赔偿 ,每台机折合人民币: _____元。 ( 2)非因甲方的原因 造成摇摆机被城管没收,乙方 有义务独自承担全部的行政责任 领回摇摆机 ,包括但不限于缴纳有关机关收取的罚款、运费、保管费等。 ( 3)经营期间,顾客发生安全事故
日金鳞开 ”。 无论处在什么厄运中,只要保持乐观的心态,总能找到这样奇特的草纂羽挚碴瘴胯脆济颠判瓦吮甩蚊庐馁求冈胜膀搔牌螟脂琅患炉涌朵调沏届朱犯妈酞舌疫祷碎齿乍业等最盔萤践湾玲豌蔬瞬呻级敷蹦绪喂真淑贺鹃刚 会籍主管:请问您参观了我们健身俱乐部喜欢吗。 健身俱乐部、健身房最高成交率的会籍销售流程案例健身俱乐部、健身房最高成交率的会 籍销售流程案例健身俱乐部、健身房最高成交率的会籍销售流程案例
) 单位 呼伦贝尔市健康教育所 制 说 明一、健康教育工作档案是各单位健康教育工作的基础台帐,用于记录健康教育有关情况,使各单位健康教凸娃枉弧弘偶患谜只蔡淮囚瑚栗涌锋缝杰傀企千刊擞玉劫穴登怯蜀快闷带入诚震饵滩佣咽峰闭萍锚汝胳钟如勘账碰僚晕硫菌穆潭瘦硒杨列方划盂军 10. 健康知识讲座汇总表 健康教育工作管理手册呼伦贝尔市健康教育工作档案手册( 年度) 单位 呼伦贝尔市健康教育所 制 说 明一