20xx秋人教pep版英语四上unit3myfriends第3课时内容摘要:

行 • What’s his name? • His name is Zhang Peng. • He’s tall and strong. • Who’s he? • He has glasses and his shoes are blue. Read and draw I have a friend. He is a boy. He has a big face, a small nose, a big mouth and small eyes. He has short hair。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。