八年级上学期期中英语考试试卷内容摘要:

ot C. cool D. cold ( ) 37. A. Carry B. Bring C. Take D. Catch ( ) 38. A. to B. at C. of D. for ( ) 39. A. washing B. running C. resting D. swimming ( ) 40. A. ran B. walked C. fell D. jumped ( ) 41. A. happy B. angry C. sad D. sorry ( ) 42. A. everything B. something C. nothing D. anything ( ) 43. A. singing B. crying C. smiling D. laughing ( ) 44. A. with B. from C. to D. on ( ) 45. A. hungry B. free C. tired D. busy 四 、阅读理解 (每小题 1 分 ,共 30 分 ) (A) My uncle is a bus driver. He goes to work at 6:30 in the morning. Every day he is very busy and gets home very late. Sometimes he es back at about 12 at night. He likes helping other bus drivers do more work. He is the first driver to e to the Bus Station and the last driver to leave. My uncle has a son, Tom. He and I are in the same class. He is taller than I. He says he loves his father and wants to be a bus driver like his 5 father. But his mother wants him to be a scientist and wants him to study hard like his two sisters. ( ) 46. My uncle works in a _________. A. factory B. shop C. railway station D. bus station ( ) 47. He goes to work at __________. A. six fifteen B. six fortyfive C. six thirty D. five thirty ( ) 48. There are ________ people in my uncle’s family. A. 4 B. 5 C. 8 D. 6 ( ) 49. Tom and I are _________. A. at school B. in different classes C. scientist D. sisters ( ) 50. Which of the following is NOT right according to the passage? A. My uncle doesn’t e back very early. B. My uncle is the last to leave the bus station every day. C. Tom’s mother doesn’t want Tom to study hard like his sisters. D. Tom’s father works very hard and his daughters study hard. ( B ) Bruno was a boy of eight. His father worked in a cinema and his mother worked in a shop. He lived not far from his school. He always walked there and walked home. On his way to school, he had to。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。