仁爱版八年级上学期期末测试卷内容摘要:

) It’s nothing serious. You’ve had a bad cold. B: _______(43) A。 Yes, Take this medicine three times a day and drink a lot of water. B: Shall I e again? A: Yes. _________(44) B: Shall I go to a party this afternoon? A: __________(45) Stay in bed and take a good rest. A. Should I take any medicine? B. fine, I’m well. C. You’d better not. D. Do you have a fever? E. I’m sorry to hear that. F. I’m sure you’ll be all well in a day or two. G: Don’t worry. V、完形填空: (10分 ) Once there lived an old man in a town. He always fot a lot of things, so his wife had to 46 to him, “Remember this.” One day he went 47 a trip alone. Before he went out, his wife said, “ Now you have all these things. Look after them 48 .” He went to the station, bought a ticket and got on the train 49 it. About an hour 50 , the conductor came to the old man and said, “Will you please 51 me your ticket?” the old man 52 his ticket in all his pockets, but he couldn’t find it. He was worried, “ I can’t find my ticket. I really bought a ticket 53 I got on the train.” Said the old man. “I think you bought a ticket. All right. You don’t have to buy 54 one,” said the conductor. But the old man still looked worried and said, “You don’t know why. If I can’t find my ticket, I don’t remember my station. 55 am I going?” 46. A. say B. says C. talk D. talked 47. A. to B. on C./ D. for 48. A. care B. careful C. well D. good 49. A. take B. and C. with D. for 50. A. ago B. after C. long D. later 51. A. see B. look at C. give D. show 52. A. found B. looked C. looked for D. looked at 53. A. before B. ago C. after D. later 54. A. others B. the other C. another D. the another 55. A. What B. When C. Why D. Where . VII、阅读理解:( 20分) A Frank bought a new doorbell, but nobody seemed to notice it. When his friends ca。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。