山东省日照市莒县20xx-20xx学年七年级上学期期中考试英语试卷内容摘要:

I’m in EEC Middle School. Here’s a picture of my room. A bed, a desk and a chair are in it. They are green. A puter is on the desk. Next to the puter is my telephone. It’s red. My phone number is 5236851. I always call my cousin in the evening. He is in China. Can you see a ring? It’s on the desk, too. What’s that under the chair? It’s my dog. It’s Kelly. Kelly is always under the chair. Can you see a tape player on the bed? It’ s mine. Some tapes are on the bed, too. 51. What’s the girl’s first name? Found A set of keys. Please call Jane at 5019999. Found A dog . Black and white. At the school gate(大门 ). Call Jenny at 5018888. A. Hand. B. Sally. C. Sally Hand. D. Hand Sally. ’s a picture of her ________. A. family B. school C. dog D. room are on the desk? A. A puter, a telephone and a ring. B. A puter, a clock and a ring. C. A telephone, a clock and a ring. D. A telephone, a radio and a puter. 54. Where’s the tape player? A. On the chair. B. Under the bed. C. On the bed. D. Under the chair. don’t know ________ from this passage(文章 ). A. her dog’s name B. her cousin’s name C. her telephone number D. the name of her school C I am a student in China now. My name is Kelly Smith. I live with my parents, two sisters and a brother in Beijing. My parents teach English in No. 6 Middle School. I study in the same school. I am happy here and I like my new school because the classmates are very kind to me. They like to play with me because I look different from them. I have blue eyes and long blonde hair. They often say I look like a doll (洋娃娃 ). Also I speak English well, so lots of students like to talk with me to improve (提高 ) their English. 56. How many(多少) people are there in Kelly’s family? A. three B. five C. six D. four 57. Kelly’s parents are _______. A. doctors B. teachers C. farmers D. officers 58. Why(为什么 ) does Kelly like her new school? A. Because it is very big. B. Because it is very beautiful C. Because the classmates are very kind to her. D. Because she looks like a doll. 59. What color are Kelly’s eyes? A. blonde B. black C. blue D. brown 60. Why do lots of students like to talk with Kelly? A. Because Kelly is a beautiful girl. B. Because Kelly’s English is very good. C. Because Kelly is very interesting. D. We don’t know. 第 Ⅱ 卷 (非选择题 共 45 分 ) 五 、 单词拼写 (本题共计 10 分) A)根据首字母或汉语提示,在答题卡上写出单词的完全形式。 (共 10小题,计 5分 ) cousin’s mother is my a______. parents’ d_________ is my sister. (they) mother is a teacher. ’ s your f_______ name, Mr. Smith? six is nine. 66. We have two _______ (图书馆 ) in ou。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。