中考系列复习题介词内容摘要:

y. A. in。 in B. to。 in C. in。 at D. on。 in 18. She came up to me, _____ a smile _____ her face. A. with。 in B. like。 on C. with。 on D. without。 at 19. He wanted to ask _____ some books ______ music. A. for。 in B. about。 of C. for。 on D. about。 about 20. His school is far _____ his home, but near ______ mine. A. from。 to B. from。 from C. to。 to D. to。 from △ 综 合 型 1. The bridge _____ the river is made ______ big stone. A. on。 from B. over。 of C. above。 in D. of。 into 2. He stayed _____ his uncle’s _____ a week. A. in。 for B. with。 till C. at。 for D. for。 about 3. I can’t swim _____ the river _____ a piece of wood. A. across。 without B. through。 with C. over。 on D. in。 by 4. The desk _____ the teacher is ______ the classroom. A. of。 in front B. to。 in front of C. at。 before D. for。 in the front of 5. John cut the pear _____ four pieces ______ a knife. A. in。 by B. into。 with C. with。 by D. to。 in 6. The other day I met a friend _____ my way to school. A. of me on B. of my on C. in D. of mine on 7. It’s easy _____ us to finish the work _____ time. A. for。 on B. of。 in C. for。 before D. of。 at 8. We, League members, should be strict _____ ourselves _____ our work. A. in。 in B. with。 with C. with。 in D. in。 with 9. She asked me to sit _____ her and help her _____ Chinese. A. between。 at B. beside。 with C. before。 in D. on。 of 10. Lin Tao answered all the questions _____ the last one _____usual. A. except。 as B. beside。 as C. except。 on D. but。 in 11. Jim’s gone ______ England with his family and he won’t be back _____。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。