09届高考英语任务型写作复习内容摘要:

subject,他给我留下了深刻而难忘的印象. It is high time that education should be normalized. There is no man but has weak points. We shouldn’t do things by halves. He left me a deep and unfettable impression. 三、怎样使用恰当的连接词 逻辑角度 合适的过渡性词汇 时间顺序 first, second, then, finally/at last , soon immediately, suddenly 空间顺序 here, there, on one side…on the other side,in front of, at the back of, next to 对称顺序 for one thing, for the other thing, on one hand,on the other hand 转折顺序 but, however, while, though, otherwise,conversely 因果顺序 because, since, as, thanks to, as a result (of), owing to, due to, 递进顺序 what’s more, besides, to make in addition, mo。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。