仁爱版英语初一上学期摸底测试内容摘要:

s to school bus, but his sister goes to work foot. A. by, on B. on, by C. take, at D. in, on 12. It’s book. A. Bob B. Bob’s C. Bobs D. Bobs’ 13. Who are those ? A. mans B. womens C. men D. woman 14. He would like some bread. A. to eat B. to drink D. eat 15. your father a desk? A. Do, have B. Does, has C. Does, have D. Do, has 16. your English tescher very old? Yes, . A. Is, she is B. Are, she’s C. Is, she’s D. Is, isn’t 17. The picture is very good. . A. Not at all B. Ok C. That’s Ok D. Thanks 18. I want bread and coke. A. a pieces of, a tin of pieces of, a tin of C. two piece of, a tins of piece of, two tin of 19. It’s seven o’clock in the morning. It’s time . A. go to school B. going to school B. to go school D. to go to school 20. The girls are playing volleyball. Let ‘s them. A. go and join B. go with C. go and look D. go and have。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。