阅读理解训练题十六内容摘要:
f recording. Background noise hardly affects the sound and recording from a pocket is perfectly possible, but it doesn’t turn off automatically. Tape length: 30 minutes per side. Weight:240g. 2) Sony M9 $ Small and very good looking, sony’s latest offering scored most for appearance. Sounds clear, but there is slight machine noise. The big control buttons are a great improvement on some of the plicated little controls on other taperecorders. Doesn’t switch off automatically but a red light shows if the machine is still running. Tape length: 60 minutes per side. Weight: 195g. 3) Sony M400 $115 Lots of little control buttons that make a noise and are difficult to use . Recording was good but machine noise lost points. Tape counter and automatic switchoff when tape has finished recording or rewinding are useful Tape length: 60 minutes per side. Weight: 230g. 4) Imperial OEM. MC $ Cheap and simple pared with the rest, but recording was good as long as there was no background noise. Use only its own make of cassette. No light to show it is on。 no fast forward button and the record button makes a loud noise. Tape length: 30 minutes per side. Weight: 285g. 5) Philips 585 $80 Handsome and simple to use, but recording is very poor at more than the remended distance of 5 cmdesigned for dictation. No recording light. Tape length: 15 minutes per side. Weight: 220g. 64. The machine that produces the best recording with the least unwanted noise is the . A. Pearlcorder S702 B. Sony M9 C. Sony M400 D . Imperial OEM MC7 65. It you want a machine which turns off automatically and weighs very little you should 3 choose the . A. Pearlcorder S702 B. Sony M9 C. Sony M400 D. Philips 585 66. Which machine is unsuitable for general use? A. Pearlcorder S702 B. Imperial OEM MC7 C. Sony M400 D. Philips 585 67. What disadvantage does only the Imperial OEM MC7 have? A. No light shows when it is on B. It requires a special cassette. C. It picks up background noise. D. The record button makes a noise. D Having reached the highest point of our route according to plan, we discovered something the map had not told us. It was impossible to climb down into the Kingo valley. The river lay deep between mountain sides that were almost vertical(垂直) .We couldn’t find any animal tracks, which usually show the best way across country, and the slopes were covered so thickly with bushes that we could not see the nature of the ground. We had somehow to break through to the river whic。阅读理解训练题十六
本资源仅提供20页预览,下载后可查看全文
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。