中考英语八年级上全程知识点总结及练习(含答案)内容摘要:

stakes. A. so careful B. as carefully as C. carefully D. as careful as 【 解析 】答案: B。 该题考查的是形容词和副词的用法比较。 该空应填副词,因为它修饰的是动词does。 该题用的是 not as+副词 +as 的结构,所以答案应是 B。 3. (2020 年重庆市中考试题 ) That day I saw some parents _________ at the back of the classroom, ________ to the teacher. A. sitting, listened B. sat, listened C. sitting, listening D. sat, listening 【 解析 】答案: C。 该题考查的是 see sb. doing sth.的句型结构和分词作状语的用法。 第一个空 stting 在句中作 saw 的宾语补足语,第二个空 listening 做伴随状语。 4. (2020 年杭州市中考试题 ) You ________ open the door before the train gets into the station. A. don’t have to B. mustn’t C. needn’t D. may not 【 解析 】答案: B。 该题考查的是几个情态动词否定式的用法区别。 don’t have to和 needn’t的意思都是 “不必 ”, may not 的意思是 “可以不 ”,只有 mustn’t表示 “不许 ”, “禁止 ”。 【满分演练】 一 . 单项填空 1. Wele back ________school. A. in B. at C. to D. on 2. Miss Gao is our new Chinese teacher ________. A. in this term B. this term C. on this term D. that term 3. I’m sorry I’m late. _____________. A. OK B. It doesn’t matter C. All right D. Thank you 4. Li Mu and Jill are talking _________where they are going. A. about B. to C. with D. for 5. There is very ______food in the house. A. a few B. little C. a little D. few 6. You’d better take a raincoat ____you. A. to B. with C. on D. for 7. The children are going to the Great Wall ______a field trip. A. to B. with C. on D. for 8. I’m______hungry. May I have a mooncake? A. a little B. little C. a few D. few 9. I’m still hungry. I’d like _________one. A. other B. another C. an other D. the other moon looks ____than the sun, but in fact the sun is ______than the moon. A. big。 big B. bigger。 bigger C. small。 small D. smaller。 smaller 11. I can see them_____football on the playground. A. play B. playing C. to play D. are playing 12. Ji Wei runs_________than I. A. fast B. faster C. fastest D. the fastest 13. I think steamed bread is ____________ hamburger. A. more delicious than B. most delicious than C. more delicious to D. most delicious to 14. What are you going to do this afternoon? __________. I’m free. A. To do my homework B. To clean my house C. To do some shopping D. Nothing much 15. May I speak to Jack? ____________. Who’s that? A. I’m Jack B. That is Jack is Jack speaking D. I’m Jack speaking 16. Why not _________ and see the play? Good idea. B. going C. to go D. goes 17. It’s cold outside. Please keep the door_________. A. close B. closing C. closes D. closed 18. My home is about two hundred metres_____our school. A. from B. far from C. away D. to 19. There are some apple trees ________her house. A. in the front of B. at the back of C. in the middle of D. at the front of 20. Which floor do you ________? A. live B. live on C. live at D. live in 二 . 完形填空 The Xingqing Palace Park(兴庆宫公园) is __1___ park in Xi’ Saturdays or Sundays, children like ___3___ there __4___ their parents. There they can play games. There is a lake and a hill in the park. Today is Sunday. Many children are playing in the park. Look! Some children __5___ on the lake. They are good __6___ it. Is the boat ___7___ a chicken? No. It looks like a duck. Some boys are pl。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。