七年级上英语unit3单元测试题及答案仁爱版内容摘要:
ang likes to make friends(交朋友 ). Now he receives(收到 ) a letter from Sam, his pen pal in England. The letter is in English. Sam is a student, too. He speaks English. He likes China. He wants to visit the Great Wall. ( ) 31. Kangkang is a _________. A. teacher B. student C. doctor ( ) 32. The letter is in _________. A. Chinese B. Japanese C. English ( ) 33. Sam lives in _________. A. China B. the . C. England ( ) 34. _________ wants to visit the Great Wall. A. Sam B. Kangkang C. Kangkang’s brother ( )35. Sam is Kangkang’s _________. A. classmate B. pen pal C. teacher B Mrs.① White doesn’t like fish at all, but Mr. White likes fish very much. He buys some fish and takes it home. Mrs. White sees the fish and she thinks, “ Good! I’ll ask my friends to have lunch and we can have the fish. They like fish very much.” Mr. White es home in the evening. He can’t find his fish. Mrs. White says, “ Oh, your cat eats it.” And she gives Mr. White some bread for supper. Mr. White is not happy at all. He takes the cat and Mrs. White goes to a shop. He says to her, “ Now you see, my cat is one kilo② and the fish is one kilo, too. The cat is here. But where is my fish?” Notes: ① Mrs. 夫人 ② kilo n. 千克,公斤 ( ) 36. What does Mr. White like very much? A. Bread. B. Chicken. C. Fish. D. His cat. ( ) 37. Does Mrs. White like fish very much? A. Yes, she does. B. No, she doesn’t. C. Yes, she likes. D. No, she not likes. ( ) 38. Who does Mrs. White ask to have the fish? A. Mr. White. B. The cat. C. Her friends. D. Her mother. ( ) 39. Does the cat eat the fish? A. Yes, it does. B. Yes, he does. C. No, the cat doesn’t. D. No, it doesn’t. ( ) 40. What does Mr. White have for supper? A. Some bread. B. Some fish. C. Some jiaozi. D. Some eggs. C My good friend, Bruce, es from England. He is twelve years old. His father is a teacher, he is in China now. His mother is a teacher, too. His mother and his sister don’t e to China. His sister is ten years old. She is a student, too. He has some friends here. They often help him with his Chinese. He can speak a little Chinese now. 阅读短 文,判断正 (T)误 (F)。 ( ) 41. Bruce is an English boy. ( ) 42. There are four people in his family. ( ) 43. His mother is in China now. ( ) 44. His。七年级上英语unit3单元测试题及答案仁爱版
相关推荐
的最小公倍数是 AB。 ( ) 如果 a 能整除 b,那么 a 是 b 的倍数。 ——————— ( ) 三、选择。 (将正确答案的序号填在括号中)( 12 分) 下列各组数中,第二个数能被第一个数整除的是( )。 ① 和 5 ② 4 和 10 ③ 和 ④ 5 和 25 a=255, b=235, a 和 b 的最小公倍数是( )。 ① 10 ② 50 ③ 150 ④ 30 在 20 中
→动脉 某人不小心手被刀割伤,流血一直不易被止住。 他可能是血液中什么成分缺少。 ( ) A.血浆 B.红细胞 C.白细胞 D.血小板 2 关于血液循环的叙述中,错误的一项是( ) A. 体循环和肺循环两条循环途径在心脏处连通在一起 B. 体循环和肺循环两部分构成了完整的循环路线 C. 在血液循环中,先进行肺循环再进行体循环 ,体循环的路线 长,范围广 2 下列血管中,流着动脉血的是( ) 2
. 3 对 B. 4对 C. 5 对 D. 6对 6.如图( 6),由 A测 B的方向是( ) A.南偏东 30176。 B.南偏东 60176。 C.北偏西 30176。 D.北偏西 60176。 7.如图( 7)图中 BC⊥ AC, CD⊥ AB,能表示点到直线(或线段)的距离的线段有( ) A. 3 对 B. 4对 C. 5对 D. 6对 8.下列命题中:( 1)一个角小于它的补角;(
ework in the evening. 根据短文内容判断正误,正 (T)错 (F) ( )64. Li Hong and Li Ping are not Twins(双胞胎 )。 ( )65. Li Hong and Li Ping are in the same class. ( )66. Their father works in a school. ( )67. My sister