20xx年秋七年级英语上册module3myschool综合小测试新版外研版内容摘要:
the walls are white. There is one blackboard on the front wall. On the back wall, there is a map. It is a map of China. We have no puters or televisions in the classroom. There are fiftysix small desks in the room. They are for the students. There is a big desk in the classroom. It is for the teachers. What’s on the desk? There are some flowers. They are for our teachers. We love them. They are good teachers. 1. What colour are the walls? A. White. B. Red. C. Black. D. Blue. 2. What’s on the back wa ll? A. A blackboard. B. A map. C. A picture. D. A window. 3. How many desks are there in the classroom? A. 55. B. 56. C. 57. D. 58. 4. What is on the big desk? A. Some books. B. Some flowers. C. A puter. D. A television. 5. Which is NOT true? A. There is one blackboard on the wall. B. There are fiftysix students in the class. C. This passage(文章 )is about a classroom. D. There is a puter for the teacher. Ⅳ . 任务型阅读 This is our classroom. It is very big. It has four windows. The windows are big, too. There are 45 students in our class. Everyone has a desk and a chair. They are all new. We look after them very well. In our classroom, there are two blackboards. One is for the。20xx年秋七年级英语上册module3myschool综合小测试新版外研版
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。