牛津9aunit3teenageproblems单元试题内容摘要:

oise B. noisy C. noisily D. quiet ( ) 13. He always makes his class _____ . A. lively and interested B. lively and interesting C. alive and interested D. alive and interesting ( ) 14. If you don’t go to the cinema tonight, _____ . A. so will I B. Neither do I C. Nor shall I D. So I will ( ) 15. _____ of the twins has been there before. A. Both B. Neither C. all D. None ( ) 16. The colours of his trousers are different from _____ of yours. A. one B. ones C. that D. those ( ) 17. “What do you think of his surfing?” “Oh, no one does __ .” A. good B. well C. better D. best ( ) 18. You look _____ . What do you _____ ? A. worry, worry about B. worry。 worried about C. worried。 worry about D. worried。 worried about ( ) 19. Running and swimming _____ good for you. A. be B. is C. are D. maybe ( ) 20. Can you please spend _____ explaining it _____ us? A. sometimes。 to B. some time。 to C. some times。 for D. sometime。 for 练习详 解 一 ,根据中文或首字母提示完成句子。 The six blind men quarrelled (争吵 )about the elephant all day。 ① ① 作动词用,“争吵,吵架”,如: Those children are always quarrelling over little things. 那些孩子们总是为小事而争吵。 ② ② 作名词用,“争吵,吵架”。 That is part of my quarrel with him .那是我和他争吵的部分原因。 ③ ③ have a quarrel with sb. For sth 就某事和某人争吵。 注: quarrel作动词时是不及物动词,不能直接接宾语。 quarrel about /over sth . with “为某事和某人争吵”, eg: 误: It’s no use quarrelling it with him . 误: It’s no use quarrelling for it with him . 正: It’s no use quarrelling about /over it with him . We couldn’t win the match without their support . 没有他们的 支持 我们是不会赢得这场比赛的 . ① 作名词用,“支撑,支持,供养,维持”。 如本例。 ② 作动词用,“支持,支援”。 Eg: They supported each other .他们互相鼓励。 注: support 不同词性的运用,当 support 作为动词时,可构成名词 supporter,意为“支持者,拥护者,供养者”。 She offered (提供 )me a cup of tea。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。