高一英语02-03上学期unit4试题内容摘要:
9。 s true story, believe it or not? 26. A. traveled B. had traveled C. should travel D. was traveling 27. A. One B. A C. an D. Certain 28. A. all B. whole C. entire D. full 29. A. was returning back B. was returning C. returned back D. had returned 30. A. put B. was putting C. had put D. would put 31. A. get B. had gotten C. would get D. was getting 32. A. along B. at C. in D. about on 33. A. on B. to C. in D. at 34. A. look B. looking C. to look D. observing 35. A. above B. under C. behind D. among 36. A. maneating B. eatman C. maneating D. eating man 37. A. getting B. making C. having D. doing 38. A. might I B. dare I C. was I able to D. could I 39. A. saving B. to save C. for saving D. to gain 40. A. and swim B. to swim C. by swimming D. in swimming 41. A. to B. into C. at D. over 42. A. width B. wide C. widely D. widen 43. A. this B. that C. such D. so 44. A. to move B. move C. moving D. moved 45. A. was happing B. had happy C. happens D. happened IV.阅读理解 阅读下列短文,从每题所给的四个选项中,选出最佳选项。 A The Dead Sea is not a sea. It is a big lake in the Jordan valley. It is near the city of Jericho. The river Jordan runs into the Dead Sea. It e from the north. The lake39。 s surface is 392 miters below sea level, the sun is hot there and the water is salty. Fish can39。 t live in the salty water and plants can not grow around it. People can not swim well in the Dead Sea. But they can floa。高一英语02-03上学期unit4试题
相关推荐
h busy people everywhere there is a real difference between meals that are eaten in a hurry and those that can be enjoyed slowly with friends. is not mentioned in the passage? ______ time Americans
34 me over the head with 35 handbag. English people seem very quiet 36 reserved (缄默的 ), usually. If we 37 a noise on the bus they look 38 and unfortable. so I was very surprised to see 39 violent
的干劲,也是白费力气。 D.这首诗与作者的另一首《现书有感》如出一辙,“蒙冲巨舰”和“半亩方塘”都借喻书本,从而紧扣《观书有感》的题意。 18.对下面这首诗的赏析,不恰当的一项是( ) 三 代[臧克家] 孩子/在土里洗澡;/爸爸/在土里流汗;/爷爷/在土里葬理。 A.这首诗三句话,二十一个字,却深刻地反映了普通农民一家三口人的悲惨命运,表现出作者惊人的概括提炼生活的能力。 B.全诗三句话
速为 v1时,往返的时间为 . m的小球 A和 B分别固定在长为 2L的轻质细杆上,且 OA= AB= L,杆以 O点为圆心,以角速度 ω 在竖直面内旋转 .则当杆端 B球通过最底点时, BA杆受到的张力是 , AO杆受到的张力是 . 重机用 5m长的钢绳吊着 1t重物以 2m/s速度水平匀速行驶 .如果突然停车,这瞬间钢丝绳所受拉力比水平匀速行驶时增加了 N. 三、实验题 (25)