人教pep版英语六下recycle1内容摘要:

rl: Look, there is a hospital next to the zoo. Walk along the street, you can find the Super Hotel on your left. Keep turning left at the hotel, and then go straight. There is a post office in the front. The cinema is south of the post office! The boy: Walk east, and then turn right. There is a clothes store on your left. Go straight ahead, you can find a post office on the right. Then turn right, the cinema is on your left. It’s south of the post office. 任务 : 写短信 走到半路的时候 ,一位朋友发来短信想与我同去 ,可他不知怎么走 ,请你帮我给他发条短信告诉他路线 . 目的 : 过程 : . . . . Can you write this message? Travelling 2. Lost one’s way (P5758,Review the present tense) the airport (P53 Good to know) 3. Buy presents (P5960 Review phoic) After travelling (Review the past tense) (Chant, Song, Diary, Newspaper, Travel DV ) 2. Communication (Letter, Postcard, City AD) May 14th Dear diary, Today was a good day and also a bad day. We went to the hotel by taxi. The driver told us many things about Kunming. I was excited about the trip. We went into the hotel but I didn’t have my backpack. I ran back to the taxi. The driver was gone. I lost my backpack in the taxi. The driver told me many things about Kunming. Mike’s Diary Good news: Bad news: That afternoon dad and I took a bus to the。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。