九年级英语上册单词复习内容摘要:

unpleasant scientist in the future however hundred hundreds of such bored everywhere snake possibleimpossible seem housework everywhere look for 使人不愉快的 科学家 未来 可是;然而 百 好几百 这样的 厌烦的 到处 蛇 可能的 —不可能的 像是;似乎 家务 到处 寻找 Reading on Page 8 Answer the following questions: 1. What are robots like? 2. What kind of jobs can robots do? Read paragraph 1. Do you think you will have your own robot? In some science fiction movies, people in the future have their own robots. These robots are just like humans. They help with the housework, and do the most unpleasant jobs. 小说 使人不愉快的 未来;将来 科幻电影 help sb. with sth. / help sb. (to) do sth. 帮助某人做某事 Section 2 While You Read 1. unpleasant adj. 不 高兴的 pleasant adj. 高兴的 pleasure n. 愉快 pleased=happy adj. 高兴的,开心的 be pleased with sb./sth. 对 … 很满意 be pleased to do sth. 做某事高兴 pleasure pleased pleasant pleased 选用 pleasant pleasure pleased 填空: • –Thanks a lot. –That’s my ________. • Our teacher was _________with our study . • I think that will be a ________trip. • I am ________ to join you. 3. How soon will the robots e out to do the things like human? 4. What can the robots in Japan do? Can these robots work for us? Read Paragraph 2 Some scientists believe that there will be such robots in the future. However, they agree it may take hundreds of years. Scientists are now trying to make robots look like people, and do the same things as us. Japanese panies have already made robots walk and dance. This kind of robot will also be fun to watch. 6. How soon will robots talk to people ? Read Paragraph 3 all scientists agree about what robots will be able to do ? But robot scientist James White thinks that it will be difficult for a robot to do the same things as a person. For exa。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。