延续性动词与非延续性动词的区分及其转换附练习和答案内容摘要:

died. Four years has passed since the old man died. He joined the Party 2 years ago. He has been in the Party for 2 years. I bought the book 5 days ago. I have had the book for 5 days. 补充练习: 1. When he arrived at the bus stop, the bus ________ for 20 minutes. A. has left B. had left C. has been away D. had been away 2. I ______ the League for 5 years so far. A. joined B. have joined C. have been in 3. The factory ________ since the February of 1988. A . has been open B. has opened C. was open D. opened 4. Mary and Rose _______friends since they met in 2020. A. have made B. have been C. made D. have bee mustn39。 t ________ until he es back.。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。