泰州市高三英语12月月考试题内容摘要:
on Wednesday evening. This overtakes the $10 billion of business agreements signed between Indian and American businessmen during the recent visit of US President Barack Obama to India. “There is enough space in the world for the development of both China and India and there are enough areas for us to cooperate,” Mr Wen told the business conference. The Chinese delegation dwarfs(使相形见拙 ) the number of trade chiefs led in recent weeks to India by US President Barack Obama (215), French President Nicolas Sarkozy (more than 60) and British Prime Minister David Cameron (about 40). Later this week, Mr Wen will travel to India’s nucleararmed neighboring rival(对手 ), Pakistan, for a twoday official visit. Though bilateral trade with China is booming, the relationship is not benefiting India as much as it might, say analysts. Delhi has been demanding greater access to Chinese medicine and IT markets as it seeks to level a large trade surplus(贸易顺差 ) in China’s favor of up to £ 25 billion. 56. We can learn from the passage that __________. A. some leaders of other different countries had been to India for visits before Mr Wen Jiaobao’s visit B. other leaders including Barack Obama last visited India five years ago C. Mr Wen had visited India for the first time as Chinese Premier D. Barack Obama paid a visit to Pakistan after leaving India 57. What does the underlined word “bilateral” in the passage mean _________? A. successful B. twosided C. later D. recent 58. What information can you get from this passage? A. Pakistan is one of the good and cooperative neighbors of India. B. Pakistan and India are good petitors in the trade with China. C. There will be a nuclear war between the two countries, India and Pakistan. D. Pakistan has developed into one of the countries armed with nuclear weapons. B Engineers at a major aerospace pany were instructed Io test the effects of birdstrikes on the windshield(挡风玻璃 ) of airliners and military jets. To simulate(模拟 D the effect of a goose colliding with an aircraft traveling at a high speed, the test engineers built a powerful gun, with which they fired dead chickens at the windshields. The simulations using the gun and the dead chickens worked extremely effectively, happily proving the suitability of the windshields, and several articles about the project appeared in the testing industry press. It so happened that another test laboratory in a different part of the world was involved in assessing birdstrikesin this case on the windshields and the drivers’ cabs(驾驶室 ) of new highspeed trains. The train test engineers had read about the pioneering test developed by the aerospace team, and so they approached them to ask for specifications of the gun and the testing methods. The aerospace engineers gave them details, and the train engineers set about building their own simulation. The simulated birdstrike tests on the train windshields and cabs produced shocking results. The supposed highspeed train windshields offered little resistance to tile highspeed chickens。 in fact every single windshield that was submitted for testing was struck to pieces, along with a number of train cabs and much of the testlab itself. The frightened train engineers were concerned that the new highspeed trains required a safety technology that was beyond their experience, so they contacted the aerospace team for advice and suggestions, sending them an extensive report of the tests and failures. The brief reply came back from the aeroengineers: “You need to defrost (解冻 ) the chickens... “ 59. The underlined phrase “colliding with” in the first paragraph can be replaced by _________. A. hitting B. catching C. throwing D. leaving 60. How did the test engineers simulate the effect of a goose colliding with an aircraft? ① defrosting the chickens ② building a powerful gun ③ putting the chickens into the gun ④ firing dead chickens at the windshields A. ③②①④ B. ②③①④ C. ②①③④ D. ③①②④ 61. The train engineers’ tests failed because A. the trains’ speed was too high B. the train windshields were not hard enough C. the testing methods were not suitable for the train D. they didn’t defrost the chickens before firing them 62. What can we learn from the aeroengineers’ brief reply? A. The train engineers were not clever enough. B. The aerospace team’s suggestions were not correct. C. The aeroengineers were playing tricks on the train engineers. D. The train engineers didn’t pay attention to energy detail C Our grand China tour will show you a different China! But you are required to present a US passport when entering China. For some important information on how to apply for a passport, see the following forms. YOU MUST SUBMIT(提交 ) FORM DS11 IF ANY OF THE FOLLOWING ARE TRUE: ★ You have never been issued(签发 ) a US passport or ★ You are under aged 16 or ★ You were under 16 when your previous passport was issued or ★ Your most recent US passport was issued more than 15 years ago or ★ Your most recent US passport was lost or stolen or ★ Your name has changed since your previous US passport was issued. NOTE: If the above statements do not apply to you, you can apply fo。泰州市高三英语12月月考试题
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。