江苏省如皋中学高一英语综合测试内容摘要:
___that people can control fires. [ ] A. This is hoped B. It hopes C. It is hoped D. That hopes 27. ( 3 分 ) China was one of the first_________in the world to study the science of farming. [ ] A. nations B. states C. countries D. powers 28. ( 3 分 ) The pany ________ all the people to put guards round fires. [ ] A. persuaded B. agreed C. enjoyed D. hoped 29. ( 3 分 ) All matter is _______atoms. [ ] A. made up of B. made of C. made from D. made into 30. ( 3 分 ) None of these improvements has ________ much. [ ] A. worth B. paid C. spent D. cost 31. ( 3 分 ) On the way to school I met with an old friend of ________. [ ] A. me B. my C. I D. mine 32. ( 3 分 ) Would you please have a cup of tea? she said to us. This sentence means: She_______us to have a cup of tea. [ ] A. told B. ordered C. asked D. wished 33. ( 3 分 ) When the fire ________he happened to ________. [ ] A. was broken out, out B. was broken out, be out C. broke out, out D. broke out, be out 34. ( 3 分 ) Most of the boys in my class are ________ of popular music. [ ] A. fond B. like C. enjoying D. love 35. ( 3 分 ) Joan needs a new coat. She is going to buy ________ . [ ] A. one B. it C. a one D. that 36. ( 3 分 ) She told me that she ________ there before. [ ] A. has never been B. has never gone C. had never been D. never went 37. ( 3 分 ) My mother is ________ to Shanghai. [ ] A .has B. has gone 38. ( 3 分 ) “My bag is missing .” “You ________it in the theatre.” [ ] A. must have left B. must leave C. must have fotton D. must fet 二、填空题。 (共 50 分 ) 39. ( 2 分 ) 根据下列句子及所给汉语注释 , 写出空缺处单词的正确形式 (每空只写一词 )。 What will be the ____。江苏省如皋中学高一英语综合测试
相关推荐
说则认为,地球上生命的种子来自宇宙,还有人推断,是同地球碰撞的彗星之一带着一个生命的胚胎,穿过宇宙,将其留在了刚刚诞生的地球之上,从而地球上才有了生命。 但是,一些科学家却对此类假说持强烈的反对意见。 他们认为,彗星是带来了某些物质,但那不是决定性的,产生生命所必需的物质在地球上本来就已经存在。 生命起源问题的另一类观点 ——宇宙胚种说 谈谈你对生命诞生的认识。 元古代 (25 亿年到 亿年前
C、 P D、 Cu 2 下列物质属于非极性分子的是 A、 H2O B、 CO2 C、 NH3 D、 HCl 2 下列物质属于原子晶体的是 A、石英 B、干冰 C、 碘 D、 烧碱 2 据最新报道钬的放射性同位素 16667 Ho可有效地治疗肝癌。 该同位素原子核内的中子数与核外电子数之差是 2 下列说法中正确的是 ,其化学性质 一定相同 ,一定具有强氧化性 ,共价键不会被破坏
的花,人间没有不曲折的路。 ” 这两句话的意思是 A.人生不可避免会遇到挫折 B.人生不如意事占大多数 C.挫折是由于天灾人祸引起的 D.我们要尽量避免挫折 【答案】 A 【解析】 试题分析:人的一生道路不会是一帆风顺的,总会遇到这样或那样的不 如意,人生难免有挫折,这是不可避免的, A是正确的, B是错误的,人生不如意的事未必会占大多数,这个因人而异, C 是错误的,产生挫折的因素有很多
形细胞核的生物称为 原核 生物 细胞中有成形细胞核的生物称为 真核 生物 二、细菌的结构 基本结构 : 细胞壁 细胞膜 细胞质 DNA 特殊结构 : 荚膜 鞭毛 其他原核生物 放线菌 三、原核生物的基本特征 • 由单细胞构成; • 细胞内没有成形的细胞核。 四、原核生物与人类的关系 • 有益: • 天然气:由数百万年前湖底、沼泽淤泥中的细菌产生 • 制造醋、味精、酸奶、泡菜及很多腌制食品