外研版七年级上册英语第一学期期中测试试题内容摘要:

Jim likes eating fish and Tom likes eating meat. B 根据文章判断正误(正确的选 A, 有误的选 B ) Dear students, The following rules are for life and work in Belleybys School . Please read them carefully.  Stand up when a teacher or a visitor goes into the room.  You must be in a classroom or other study places during lesson time.  Get to school in time. Bring the things you need to school, and get ready to start work.  Wear clean clothes. Hair must be clean. Strange colours are NOT allowed(允许 ). Long hair must be tied(扎、系 )back.  Do not leave school if you are not allowed.  Food and drink must not be taken out from the dining room.  All medicines must be given by the school doctor.  Radios and personal puters may ONLY be used in the dormitory(宿舍) . They are not allowed in classes or the library. Belleybys Schools 61. You must be only in a classroom during a lesson time. 62. Long hair must be tied back. 63. Personal puters can be used in the library. 64. You may eat in the classroom. 65. You may not listen to the radio in class. C Miss Williams is a teacher, and there are thirty children in her class. They are nice children, and Miss Williams like them all, but they often lose (丢失 )some of the clothes. It’s winter, and the weather is very cold. The children’s mothers always take them to school with warm coats and hats and gloves(手套) . The children e into the classroom in the morning and take off their coats and hats and gloves, and put the gloves in the pockets of their coats. Last Tuesday, Miss Williams found two small blue gloves on the floor in the evening, and the next morning, she asked the children, “Whose gloves are these?” But no one answered. “Haven’t you got blue gloves, Dick?” she asked him. “Yes, Miss Williams,” he answered, “but those can’t be mine. I’ve lost already.” 66. Miss Williams worked in _____. A. a hospital B. a school C. a factory D. a bank 67. In winter, the children wore (穿 ) coats and gloves to _____. A. play with snow B. keep warm C. play basketball outside 68. The two small gloves were for _____. A. Dick B. other children C. nobody D. Williams 69. Miss Williams found the gloves _____. A. in the chair B. on the floor C. on the road D. on the desk 70. Which sentence is NOT right? A. The children’s mothers often take them to school. B. Dick hasn’t got any gloves. C. Children put the gloves in the pockets of their coats. D. Miss Williams thinks the children are nice. 第二部分 非选择性试题 一.补全对话。 (每小题 1 分,共 5 分) 从所给句子中选择恰当的句子完成下列对话。 请把答案填涂在机读卡上。 (若选 E, 则填涂 A 和 B; 选 F,则涂 C 和 D) ( W: Wang B: Bill ) W: Hi. B: Hi. W: 71_______ B: Yes. I am American. W: Can I have a talk with you? B: 72________ W: You know, I’m studying English at school, but I’m weak in it. 73_____ B: Oh, you speak good English. W: Thank you. By the way, 74__________ B: No. I’m studying Chinese in Beijing . Can I talk with you in Chinese next time? W: No problem. B: Well, I have to go now. 75________ W: Me, too. Byebye. B: Bye. A. So I want to speak more English. B. Do you work in China ? C. Sure. D. Very nice talking to you. E. Do you speak English? F. Are you English? 二 . 从方框中选词并用其适当的形式填空 (每小题 1 分,共 10 分 ) it, and, be, not e, dance, milk, go, swim, have, she 1. My grandfather has got some fish. They are red, orange and blue. They ___ all day. 2. People should drink some _____, juice or water and should not eat candy or ice cream. 3. What’s the weather like today? ____ is fine. 4. My uncle is a manager ____ he works in a。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。