中考英语名词考向分析与考点训练内容摘要:
1. The tiger39。 s______(tooth) are bigger than the monkey39。 s. 2. There are two new ______ (shelf) in my study. 3. Jim and Mike are good friends of _______(I). 4. Many ______(foreign) have visited Beijing in the last few years. 5. Two ______teach English in my school. (English)。 1. There are ______ vegetables in the basket, but there isn39。 t ______ meat in it. A. some。 a B. some。 any C. any。 any D. some。 some 2. There are a lot of ______ down there, but hardly any ______. A.。中考英语名词考向分析与考点训练
相关推荐
shall I do ? she said. Then a policeman came and said to her kindly (和蔼地 ). Good morning, Madam. Don39。 t you like any of our colours today? ( ) 51. Mrs Green’s grandchildren didn’t want her to drive
studied D. gone 中小学教育 资源站 中小学教育资源站 ( )42. The little girl is afraid of ____ at night. A. go B. goes C. going D. went ( )43. As soon as he ____, he will write to me. A. arrives at B. arrives C.
会统一安排了现场会的内容、时间和出席人员,以及会议中应注意的问题。 [简析 ] “安排”“问题”动宾搭配不当。 [应改为 ] 常委会统一安排了现场会的内容、时间和出席人员,并提出了会议中应注意的问题。 [例 5]蜜蜂每酿造一斤蜜,大约要采集( 50万朵)的花粉。 [简析 ]定语“五十万朵”与中心词“花粉”搭配不当。 [应改为 ]蜜蜂每酿造一斤蜜,大约要采集 50万朵花的花粉 [例 6]他们
方法有很多,我们可以按颜色分,黄色是一组,红色是一组;还可以按种类分,汽车是一组,布娃娃是一组 把图中是学习用品的圈出来 这三项是学习用品,可以归为一
A. my B. I C. mine D. me 3. Oh, your kite is very nice. __________________. A. That’s right B. No, it’s not nice C. Yes, it is D. Thank you 4. The woman is sixty, but she _______ young. A. is B. sees