20xx年秋七年级英语上册module9peopleandplaces主题阅读新版外研版内容摘要:
d his father are sitting at the table. They are having their lunch. “I don’t like this soup. I don ’t want to have it,” says Mike. After lunch, Mike and his father work on the farm. They work hard. In the evening, Mike’s father gives him a bowl of soup. “Oh, this soup is nice,” says Mike. “It is the same soup,” says his father. 1. Who doesn’t like the soup? A. Mike. B. Mike’s father. C. Mike’s mother. D. A and B. 2. After lunch, they work________. A. in the factory B. on the farm C. in the school D. in the hospital 3. In the evening, Mike’s father gives him ________. A. a bowl of rice B. a piece of meat C.。20xx年秋七年级英语上册module9peopleandplaces主题阅读新版外研版
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。