09初二上英语期中试卷内容摘要:
n: If you have a group of sheep, I send you 7 group. Then, you say, how many groups of sheep do you have?” “Why! That’s the easiest question in the world. One and one is two. 8 knows that. I have two groups of sheep, of course.” Tom laughed and laughed and said, “You are quite 9 , sir. Two groups of sheep put together is still one group. That’s the 10 question in the world, isn’t it? ( ) 1. A. something B. nothing C. everything D. anything ( ) 2. A. smile B. smiles C. smiling D. a smile ( ) 3. A. happy B. sad C. unhappy D. sorry ( ) 4. A. don’t B. don’t be C. not be D. isn’t ( ) 5. A. with B. to C. for D. about ( ) 6. A. say B. speak C. ask D. tell ( ) 7. A. other B. the other C. one D. another ( ) 8. A. People B. Anybody C. Somebody D. Nobody ( ) 9. A. right B. clever C. wrong D. difficult ( )10. A. more difficult B. easier C. most difficult D. easiest 三、阅读 理解:( 20%) A A driver stopped his car on a street side to have a rest. When he sat in the seat and closed his eyes, a pedestrian (行人 ) came up and knocked at his window to ask the time. The driver opened his eyes and looked at his watch, “It is 8 o’clock.” He said. Then he went to sleep again. But soon he woke up because a second pedestrian was knocking at the window, “Sir, do you have the time?” he asked. The driver looked at his watch again and told the man it was 8:30. If it happened again, he could not have a good rest. So he wrote a short note and put it on the window for all the people to see. It said, “I don’t have the time.” Again the man sat in the seat and slept. A few minutes later a third pedestrian came along and began knocking at the window. “Hey, sir,” she said, “It’s 8:45.” ( ) 1. The driver stopped his car to __________. A. have breakfast B. have a rest C. have lunch D. tell time ( ) 2. The first pedestrian knocked at his window to __________. him up B. take his car C. ask the time D. buy his car ( ) 3. “I don’t have the time.” The driver wanted to tell pedestrians “__________.” A. Don’t ask me the time B. I don’t have a watch C. I want to know the time D. I don’t want to know the time ( ) 4. Why did the third pedestrian e along and begin knocking at the window? A. She wanted to know the time. B. She thought the driver was ill.。09初二上英语期中试卷
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。