20xx届中考英语数词复习课件内容摘要:
乌鲁木齐 ) • Dick, it is the ________ time in ________ days that you’ve made the same mistake. • A. two, three B. second , three • C. two, third D. second, third • [解题技巧 ] • 以此立意的试题要求考生能正确使用基数词和序数词: 基数词用来表达事物的量;序数词用来表达事物的顺序。 • 本题的第一空表示顺序用序数词 second;第二空用基数词 three,答案为 B。 B • (苏州) • It is said that the gravity(引力 ) on Mars is only about __________ of the gravity on earth. • A. three- eighths B. third- eighth • C. three- eights D. third- eight • [解题技巧 ] • 以此立意的试题考查考生能否正确使用分数: 分子在前用基数,分母在后用序数。 分子大于一,分母用复数,分子与分母之间可以用连字符连起来也可以不用连字符,如 two thirds或 twothirds;当分数修饰名词作定语时,后要跟 of,如: two thirds of students 三分之二的学生 • 本题的选项中只有 A项正确。 A 3. hundred,thousand,million,billion等单位数词 • - How many people will e to Beijing next year? • - It’s hard to say, ________ people, I think. • A. million of B. millions of C. three millions • D. three millions of (2020芜湖 ) • [解题技巧 ] • 以此立意的试题考查考生能否正确使用 hundred等单位。20xx届中考英语数词复习课件
相关推荐
hort time. A. why B. how C. when D. where B 答案: B (选择 A的同学要注意语境,这里指他们怎么能在如此短的时间里完成如此多的困难的工作 .) 3. 介词、连词 Do you speak English? Yes, I speak __a little English ___ some French. A. neither, not B. both,
was bought yesterday. was made the heavy work. for me to do •A traffic accident ________(happen) just now. happened 2. 连系动词 ( .) 如: be, look, seem, feel, sound, smell, taste, get, turn, bee… •Peking
的。 中国主张的五项基本原则是: ,目的是实现各国的 与。 一些还没有获得独立的 和属地,叫做。 资本主义 社会主义 平等 P87 共同进步 发展 殖民地 “地区” 经济发展水平 发达国家 ( ) 发展中国家 ( ) 请你列举并在地图上找到这些国家 Developed country Developing country 找出发达国家和发展中国家的分布地区 非 发达国家集中在。 发展中国家集中在
„„” 时 one of +最高级 +名词复数 the first/second/third+最高级 +名词单数。 用 or连接两项需作比较的内容时,须用比较级;若 or连接三项或三项以上的内容时,则须用最高级。 Who is taller, Mary or Jane? Which is biggest, the sun, the moon or the earth? 掌握几种同义句转换 He
NH4 H CO3( S) NH3+ H2O( g) +CO2Q 15. 进行中和滴定时,事先不应该用所盛溶液润洗的仪器是 ( ) 二: 多选题 (每小题有 1— 2 个选项符合题义) 16. 一定量的盐酸跟足量的锌反应时,为了减缓化学反应 速率,且不影响生成 H2的总量,可向盐酸中加入少量的 ( ) 固体 O 17. 在甲酸的下列性质中,可能证明它是弱电解质的是 ( )