20xx届中考英语形容词和副词比较级和最高级的用法内容摘要:
„„” 时 one of +最高级 +名词复数 the first/second/third+最高级 +名词单数。 用 or连接两项需作比较的内容时,须用比较级;若 or连接三项或三项以上的内容时,则须用最高级。 Who is taller, Mary or Jane? Which is biggest, the sun, the moon or the earth? 掌握几种同义句转换 He is taller than any other student in his class. = He is taller than the other students in his class. = He is the tallest (student)in his class. 用所给形容词的正确形式填空 is a ______ street. That street is______. Zhong Shan Road is __。20xx届中考英语形容词和副词比较级和最高级的用法
相关推荐
乌鲁木齐 ) • Dick, it is the ________ time in ________ days that you’ve made the same mistake. • A. two, three B. second , three • C. two, third D. second, third • [解题技巧 ] • 以此立意的试题要求考生能正确使用基数词和序数词:
hort time. A. why B. how C. when D. where B 答案: B (选择 A的同学要注意语境,这里指他们怎么能在如此短的时间里完成如此多的困难的工作 .) 3. 介词、连词 Do you speak English? Yes, I speak __a little English ___ some French. A. neither, not B. both,
was bought yesterday. was made the heavy work. for me to do •A traffic accident ________(happen) just now. happened 2. 连系动词 ( .) 如: be, look, seem, feel, sound, smell, taste, get, turn, bee… •Peking
NH4 H CO3( S) NH3+ H2O( g) +CO2Q 15. 进行中和滴定时,事先不应该用所盛溶液润洗的仪器是 ( ) 二: 多选题 (每小题有 1— 2 个选项符合题义) 16. 一定量的盐酸跟足量的锌反应时,为了减缓化学反应 速率,且不影响生成 H2的总量,可向盐酸中加入少量的 ( ) 固体 O 17. 在甲酸的下列性质中,可能证明它是弱电解质的是 ( )
,必然事件是 . ( ) A. 2020年 2月有 30天; B.明天会下雪; C.今天星期四,明天星期五; D.小彬明天的考试将得满分。 二二 .. 填填 空空 题题 (( 每小题 3 分,共 18 分 )) 1如果 收入 50元记作 +50,那么 80 表示 __________________;如果 20%表示减少 20%,那么 +68%表示 __________________。 1