牛津小学英语3aunit3单元练习题内容摘要:
告别应该说: 5. Hi, Wang Bing. ( ) F 早上见王老师应该说: 6. This is my mother. ( ) G 和王兵打招呼应该说: 7. What colour? 三.根据汉语意思,判断下列单词搭配是否正确,用 “√” 或 “” 表示 1.一头白色的大象 a white elephant ( ) 2.一些红色的苹果 some red pears ( ) 3。牛津小学英语3aunit3单元练习题
相关推荐
family and was afraid of it and promised he would stop drinking at once. The man told him to wait to be dealt with. One Monday morning , Mr Smith came into the office with two badly burned ears.
( ) 2. 你有事打扰别人,你说: ( ) 3. 当你不知道那是否是一个录音机时,可以问: ( ) 4. 你问别人这用英语怎么说,应该问: ( ) 5. 你向你的好朋友介绍你父亲是可以说: 【设计意图: 学生学习 语言 ,不能只停留在“理解”的层面上,更重要的是“运用”。 通过这个练习,让学生学用结合,进一步领会 所学语言的意义和用法,充分显示了课堂向课外的延伸。 】 四、 听录音
I see a dog. ( ) 3 A Yes, I like fish. B No, I like fish. ( ) 4 A Have some water. B Have some cake. ( ) 5 A I have got a pen. B He has got a pen. 笔试 ( 50) 六 按顺序默写 26个大小写字母 15% 七 写出下列词的同类词 12% 1
_______ (35) you have any other colour? A: Oh , yes. We have also got blue , red and brown ones. B: Can I have a ________(36) at the brown ones? A: Yes, please. B: How ________ (37) does this pair
n left, they also watched a video show about people living and working in a space lab. The people could stay in the space lab for months. ( )36. A. is B. are C. was D. were ( )37. A. how B. what C.
面短文,掌握其大意,然后从各小题所给四个选项中,选出一个最佳答案。 (10 分 ) It was Saturday 1 in May. When 2 Read opened the window and 3 , she smiled and said, “ It is going to be a beautiful day.” She 4 her small son up at 8:30 and