山东省20xx届九年级上学期期中考试英语试卷内容摘要:
t C. a football game D. a flower show 45. Which of the following is TRUE?________ A. Rosie spent her weekend in Paris happily. B. On Saturday Sophia wasn’t very well. C. Steve and Jack both had fun on Saturday. D. The winter in Australia was windy but not cold! C A farmer had a faithful(忠诚的) horse who was old and couldn’t do much work. So the farmer no longer wanted to give him anything to eat and said, “ If you can bring me a lion here, I will keep you.” The horse was sad, and went to the forest. There he met a fox. After the fox heard the story, he said. “ I will help you. Just lie down, as if you were dead, and do not move.’’ The horse did what the fox asked, and then the fox went to the lion and said, “ A dead horse is lying out there. Just e with me, and you have a rich meal.” The lion went with him, and they were both standing by the horse, the fox said, “ Now let me tie the horse to your tail and you can take it home and eat it.” The fox’ s words made the lion very happy. But the fox tied the lion’s legs together with the horse’ s tail. When the fox finished his work, he said to the horse, “ Pull the lion to the farmer.” Then the horse pulled the lion away with him at once. The lion was very angry but he couldn’ t do anything. When the farmer saw the lion, he was in a good mood(心情) , and said to the horse, “ You can stay with me.’’ And he gave him enough food to eat until the horse died. 46. The farmer didn ’ t want to keep his horse any more because___________. A. the horse was lazy B. the horse didn’ t follow the farmer’ s words C. the horse was ill D. the horse was too old to do much work. 47. The lion believed the fox’ s words because________________. A. he could make friends with the fox B. he wanted to eat the horse C. he wanted to save the horse D. he could be sent to the farmer 48. The fox cheated ________ according the passage. A. himself B. the horse C. the lion D. nobody 49. Which of the following is TRUE? _______ A. The farmer was angry with the fox. B. The fox helped the lion eat the horse. C. The farmer accepted(接受) the horse at last. D. At last the horse left the farmer. 50. What is the best title of the story? A. A kind fox. B. A stupid lion clever idea D. A silly horse. D The government in China plans to end its onechild policy(政策 ) and let families have two children instead. The plan was announced(宣布) on Thursday after highlevel political meetings in Beijing. A Chinese Communist Party statement gave a number of reasons for the change in policy. The statement said the change is meant to balance population development, stop a falling birth rate(出生率 ) and strengthen the country’ s labor(劳动力 ) force. China, with the largest population in the world, started the onechild policy in 1980. But the government allowed only a small number of couples to have two children. For example, some families in the countryside could have two children, if the firstborn child is a girl. In 2020, the Chinese government gave other couples a chance to have two children if one of them was an only child. Jiang Quanbao, a teacher and population expert, explained how Chinese families react(反应) to the newest policy. “ Too many young people in the cities are no longer interested in having a second child,” he said. “ People in the countryside are more interested. But some of them are already allowed to have two children. ” At the end of 2020, China had a population of billion people. A total of 800 million of them have jobs. But the labor market population。山东省20xx届九年级上学期期中考试英语试卷
相关推荐
部规范所有法律行为的法,又被称为“管法的法”。 十二届全国人大三次会议审议通过了立法法修正案草案。 立法法修正案新增规定,地方政府规章不得设定减损公民权利或者增加其义务的规范。 这表明了 ①全国人民代表大会行使最高立法权②地方各级人民代表大会没有立法权 ③我国法律必须代表全体公民的意志④立法法的修正有利于规范立法行为 A.①② B.①④ C.②③ D.③④ 4月 22日是世 界阅读日
考点,涉及有机物的结构与性质、有机物的制备实验等,把握实验操作和实验原理为解答的关键,侧重分析与实验能力的考查,注意 C为易错点,题目难度不大. 9.只用水就能鉴别的一组物质是( ) A. 苯、乙酸、四氯化碳 B.乙醇、乙醛、乙酸 C.乙醛、乙二醇、硝基苯 D.苯酚、乙醇、甘油 【分析】 只用水就能鉴别的有机物,可根据有机物的水溶性和密度的大小异同鉴别,以此解答该题. 【解答】 解:
,惹得桥玄生气,威胁要让他的母亲改嫁,郡内士大夫争相劝谏,桥玄才停做这件事。 C.桥玄位列公 位时,推荐与自己素有矛盾的南阳太守陈球做廷尉,又奏请皇帝免去与皇帝有旧恩的太中大夫盖升之职并将其关押起来,皇帝没有同意。 D.桥玄 10岁的小儿子被人劫持,绑匪索要财物,桥玄不许,并催促已包围劫匪 的士兵发起进攻,自己儿子遂被杀死。 但从此劫持人质的事件再也没有了。 第 Ⅱ 卷(非选择题,共 114分)
级生物所储存的能量 C.生态系统维持正常功能需要不断得到来自系统外的能量 D.生产者固定的能量除用于自身呼吸外,其余均流入下一营养级 ,下列关于该系统的叙述错误的是 ( ) A.微生物利用的是农作物通过光合作用固定的能量 B.多途径利用农作物可提高该系统中能量的传递效率 C.沼渣、沼液作为肥料还田可以促进物质循环再利用 D.食用菌、产甲烷菌及蚯蚓是该生态系统中的分解者
、蔗基鱼塘被保留的很少,反映了该生态循环农业模式 近年来,我国有些农村出现了“有院无人住,有地无人种”的空心化现象。 完成 25—— 26题。 26.“有院无人住,有地无人种”带来 一个国家中某种商品出口的比较优势程度用 R值表示, R 值越大表示该商品出口的优势越强。 表 1 为 20202020 年中国、东南亚 Y 国出口商品比较优势前六位的 R 值。 读表完成2728题。 、
A.①② B.①③ C.②④ D.③④ 19. 2020 年 10 月 1 日新疆自治区成立 60 周年, 60 年来,新疆取得令人瞩目的成就,民族团结是新疆各族人民的生命线。 下列选项中能体现这一原则的是 ①兄弟虽有小忿,不废懿亲 —— 《左传僖公二十四年》 ②万人操弓,共射一招,招无不中 —— 《吕氏春秋》 ③天行健,君子以自强不息 —— 《易经乾卦》 ④操干曲而后晓声,观千剑而后识器 ——