初二英语期终测试题内容摘要:
u, sir?” “Your colleague (同行 ) , a poor 49 like you.” Then Mozart gave the 50 back to the old man and went away. ( )4 A. on B. by C. with D. to ( )4 A. writing B. playing C. reading D. listening ( )4 A. sometime B. sometimes C. some time D. some times ( )4 A. you B. it is C. Mr. D. sir ( )4 A. make B. buy C. give D. take ( )4 A. certainly B. did C. yes D. sorry ( )4 A. which B. how C. that D. what ( )4 A. happy B. worried C. disappointed D. surprised ( )4 A. musician B. artist C. scientist D. writer ( )50、 A. money B. violin C. food D. hat 四.阅读理解。 20’ A When Mr. David retired(退休) ,he bought a small house in a village near the sea. He liked it and hoped to live a quiet life in it. But to his great surprise, many tourists(游客) came to see his house in summer holidays, for it was the most interesting building in the village. From morning to night there were tourists outside the house. They kept looking into the rooms through the windows and many of them even went into Mr. David’s garden. This was too much for Mr. David. He decided to drive the visitors away. So he put a notice on the window. The notice said: “If you want to satisfy your curiosity(好奇心) , came in and look round. Price(价格) : twenty dollars.” Mr. David was sure that the visitors would stop ing, but he was wrong. More and more visitors came and Mr. David had to spend every day showing them around his house. “I came here to retire, not to work as a guide(导游) .” he said angrily. In the end, he sold the house and moved away. 5 Mr. David’s house was that many tourists came to see it. A. so small B. so quiet C. so interesting D. such interesting 5 Mr. David put a notice on the window in order . A. to drive the visitors away B. to satisfy the visitor’s curiosity C. to let visitors e in and look round D. to get some money out of the visitors 5 The notice made the visitors . A. more interested in his house B. lost interest in his house C. angry at the unfair price D. feel happy about the price 5 After Mr. David put up the notice . A. the visitors didn’t e any longer B. fewer and fewer visitors came to see his house C. more and more tourists came for a visit D. no tourist would pay the money for a visit 5 At last he had to sell his house and move away because . A. he did not like it at all B. he could not work as a guide C. he made enough money and wanted to buy a new expensive house D. he could not live a quiet life in it。初二英语期终测试题
相关推荐
自 1989 年经国务院批准开展创建卫生城市活动以来,全国已有中山、深圳、珠海、大连、厦门等 29 个城市经考核被命名为国家卫生城市。 其中,中山、深圳、珠海等不少城市在此基础上又分别获得了环保模范城市、园林城市等荣誉,成为城市中的样板。 然而,来自全国爱卫会的消息表明: [一些城市为了应付检查,不是下大力气去提高日常管理水平,而是搞突击甚至弄虚作假,影响了检查评比的效果。 ]为此
人,但文章为什么又写他是个和蔼的人,还称我们是“小友”。 ( 3 分) 答: ( )( 2 分) ,这两段内容是作者的随意回忆,为文章增加一些童趣。 “我”小时候爱读书,求知欲强。 ,叔祖太太限长妈妈对比,突出长妈妈善良、朴实的优秀品质。 [二 ] 一位朋友向我讲述了在南美洲一片森林边缘发生的故事。 那一天,由于游客的不慎,使临河的一片草丛起火了,顺着风势游走着的火舌活像一挂红色的项链
他们确实是我们最可爱的人。 ◇ 1 、这个文段选自 的《 》,这篇文章属于新闻文体中的。 ◇ 2 、文中括号内应填入的词语依次是 ( ) A、所以 B、因为 C、只要 D、就 E、只有 F、才能 ◇ 3 、“请你意识到这是一种幸福吧”这一句从语气上看属于 ( ) A、疑问句 B、祈使句 C、陈述句 D、感叹句 ◇ 4 、这段文字运用了哪种修辞手法。 采用这种手法的作用是什么。 答:。 ◇ 5
tree had fallen down and broke the top of the back room. ( ) storm happened________. the morning the afternoon I was in the back room I was in the garden ( ) the storm came, the weather was_________.