高考英语模拟试题(三)内容摘要:

in Shanghai. The earliest table tennis hall (43) in 1916 in Shanghai. It was equipped (44) nine tables. Many youngsters went there (45) pingpong. The game then was popularized in (46) big cities such as Beijing, Tianjin and Guangzhou. (47) 1918 the Shanghai Table Tennis Federation was founded. (48) pingpong was not nly a kind of (49) but a match of skill and physical strength (50) . 26. A. was introduced B. was carried C. brought D. took 27. A. reported B. is said C. brought D. wrote 28. A. that B. whom C. who D. which 29. A. sailed B. flew C. went by train D. telephoned 30. A. In B. When C. Since D. During 31. A. persons B. Japanese C. Chinese D. foreigners 32. A. looked at B. worked out C. found D. discovered 33. A. much too B. too many C. so much D. too much 34. A. good B. right C. funny D. enough 35. A. counter B. street C. school D. city 36. A. But B. Although C. However D. Yet 37. A. something B. the use of C. nothing about D. how playing 38. A. sell out B. sell good C. buy by other D. sell well 39. A. gave a poster B. ran a class C. put on a show D. taught some people 40. A. to play B. to learn C. watch D. match 41. A. who B. whom C. that D. whose 42. A. were weled B. was sold C. are brought D. has been popular 43. A. built B. put up C. was set up D. ran 44. A. on B. under C. at D. with 45. A. watch B. buy C. learn D. to play 46. A. other B. the other C. another D. any 47. A. On B. In C. At D. With 48. A. At the period B. During the course C. From then on D. On those days 49. A. amusement B. fun C. course D. lesson 50. A. too B. either C. at the same D. as well Ⅲ . 阅读理解(共 25 小题。 A 节每小题 2 分, B 节每小题 1分;满分 45 分) 阅读下列短文,从每题所给的四个选项中,选出最佳答案。 A Books which give instructions。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。